Brunei vs Iceland: Dealing with construction permits: Time (days) (Time days)

Brunei
83 days
in 2019
Iceland
84 days
in 2019
Brunei rank
167th
Iceland rank
166th

Dealing with construction permits: Time (days) (Time days) over time

  • Brunei
  • Iceland
050100150200520122019

How they compare

Iceland currently reports 84 days against 83 days in Brunei, a difference of 1 days.

The two have swapped places 1 time across 14 shared years of data; in 2006 it was Brunei ahead.

Brunei ranks 167th and Iceland ranks 166th of 188 countries.

Brunei has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei Iceland Difference Ahead
2000s 119 days 92 days 27 days Brunei
2010s 100 days 84 days 16 days Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brunei or Iceland?
Iceland, at 84 days against 83 days in Brunei as of 2019.
What is the difference in dealing with construction permits: time between Brunei and Iceland?
1 days, with Iceland ahead.
How many years of comparable data are there for Brunei and Iceland?
14 years are reported by both, from 2006 to 2019.
How do Brunei and Iceland rank globally for dealing with construction permits: time?
Brunei ranks 167th and Iceland ranks 166th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei vs Iceland: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/brunei-darussalam/iceland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/brunei-darussalam/iceland/">Brunei vs Iceland: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.