Dealing with construction permits: Time (days) (Time days) in Brunei

Brunei: Dealing with construction permits: Time was 83 days in 2019. ▼ Falling

Latest (2019)
83 days
Change on year
unchanged
World rank
167th
of 188 countries
All-time high
127 days
in 2006
All-time low
83 days
in 2017
Years of data
14
2006–2019

Dealing with construction permits: Time in Brunei, 2006–2019

0501001502006201220192006: 127 days2007: 127 days2008: 111 days2009: 111 days2010: 111 days2011: 111 days2012: 111 days2013: 111 days2014: 111 days2015: 111 days2016: 85 days2017: 83 days2018: 83 days2019: 83 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Brunei is 83 days, measured in 2019. That is the lowest value across all 14 years on record.

Compared with earlier readings it is down 25.2% over ten years.

Over the whole period, dealing with construction permits: time in Brunei peaked at 127 days in 2006 and was at its lowest, 83 days, in 2017.

That places Brunei 167th out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 14 years of available data.

Dealing with construction permits: Time in Brunei, year by year

Annual values for Dealing with construction permits: Time (days) in Brunei, 2006 to 2019.
Year days Change
2006 127 days —
2007 127 days +0.0%
2008 111 days -12.6%
2009 111 days +0.0%
2010 111 days +0.0%
2011 111 days +0.0%
2012 111 days +0.0%
2013 111 days +0.0%
2014 111 days +0.0%
2015 111 days +0.0%
2016 85 days -23.4%
2017 83 days -2.4%
2018 83 days +0.0%
2019 83 days +0.0%

Brunei compared with similar countries

  • Brunei's 83 days is below the median for high income countries, which is 144.75 days, 57% of the median. (62 countries reporting)
  • Brunei's 83 days is below the median for East Asia & Pacific, which is 103.67 days, 80% of the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 119 days 111 days 127 days 4
2010s 100 days 83 days 111 days 10

Countries ranked near Brunei

  1. 165 Micronesia (country) 85 days compare
  2. 166 Iceland 84 days compare
  3. 168 Mexico 82.12 days compare
  4. 169 Taiwan 82 days compare
  5. 170 United States 80.6 days compare

See the full ranking of 188 places →

More private sector data for Brunei

All data for Brunei →

Frequently asked questions

What is dealing with construction permits: time in Brunei?
Dealing with construction permits: time in Brunei was 83 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Brunei?
The highest recorded value was 127 days in 2006.
What is the lowest dealing with construction permits: time recorded in Brunei?
The lowest recorded value was 83 days in 2017.
How does Brunei rank for dealing with construction permits: time?
Brunei ranks 167th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Brunei?
Over the last ten years it is down 25.2%. The long-run trend across the full record is falling.
Where does this Brunei data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Brunei. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/brunei-darussalam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/brunei-darussalam/">Dealing with construction permits: Time in Brunei</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.