Dealing with construction permits: Time in Brunei Darussalam

Brunei Darussalam: Dealing with construction permits: Time was 83 days in 2019. ▼ Falling

Latest (2019)
83 days
Change on year
unchanged
World rank
164th
of 185 countries
All-time high
127 days
in 2006
All-time low
83 days
in 2017
Years of data
14
2006–2019

Dealing with construction permits: Time in Brunei Darussalam, 2006–2019

0501001502006201220192006: 127 days2007: 127 days2008: 111 days2009: 111 days2010: 111 days2011: 111 days2012: 111 days2013: 111 days2014: 111 days2015: 111 days2016: 85 days2017: 83 days2018: 83 days2019: 83 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Brunei Darussalam is 83 days, measured in 2019. That is the lowest value across all 14 years on record.

Compared with earlier readings it is down 25.2% over ten years.

Over the whole period, dealing with construction permits: time in Brunei Darussalam peaked at 127 days in 2006 and was at its lowest, 83 days, in 2017.

That places Brunei Darussalam 164th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 14 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 119 days 111 days 127 days 4
2010s 100 days 83 days 111 days 10

Countries ranked near Brunei Darussalam

  1. 162 Micronesia, Fed. Sts. 85 days compare
  2. 163 Iceland 84 days compare
  3. 165 Mexico 82.12 days compare
  4. 166 Taiwan 82 days compare
  5. 167 United States 80.6 days compare

See the full ranking of 187 places →

More private sector data for Brunei Darussalam

All data for Brunei Darussalam →

Frequently asked questions

What is dealing with construction permits: time in Brunei Darussalam?
Dealing with construction permits: time in Brunei Darussalam was 83 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Brunei Darussalam?
The highest recorded value was 127 days in 2006.
What is the lowest dealing with construction permits: time recorded in Brunei Darussalam?
The lowest recorded value was 83 days in 2017.
How does Brunei Darussalam rank for dealing with construction permits: time?
Brunei Darussalam ranks 164th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Brunei Darussalam?
Over the last ten years it is down 25.2%. The long-run trend across the full record is falling.
Where does this Brunei Darussalam data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.