Dealing with construction permits: Time in Iceland

Iceland: Dealing with construction permits: Time was 84 days in 2019. ▼ Falling

Latest (2019)
84 days
Change on year
unchanged
World rank
163rd
of 185 countries
All-time high
115 days
in 2005
All-time low
84 days
in 2008
Years of data
15
2005–2019

Dealing with construction permits: Time in Iceland, 2005–2019

02550751001252005201220192005: 115 days2006: 100 days2007: 100 days2008: 84 days2009: 84 days2010: 84 days2011: 84 days2012: 84 days2013: 84 days2014: 84 days2015: 84 days2016: 84 days2017: 84 days2018: 84 days2019: 84 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Iceland stood at 84 days. That is the lowest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Iceland peaked at 115 days in 2005 and was at its lowest, 84 days, in 2008.

Iceland ranks 163rd of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 96.6 days 84 days 115 days 5
2010s 84 days 84 days 84 days 10

Countries ranked near Iceland

  1. 160 Sri Lanka 86 days compare
  2. 160 United Kingdom 86 days compare
  3. 162 Micronesia, Fed. Sts. 85 days compare
  4. 164 Brunei Darussalam 83 days compare
  5. 165 Mexico 82.12 days compare
  6. 166 Taiwan 82 days compare

See the full ranking of 187 places →

More private sector data for Iceland

All data for Iceland →

Frequently asked questions

What is dealing with construction permits: time in Iceland?
Dealing with construction permits: time in Iceland was 84 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Iceland?
The highest recorded value was 115 days in 2005.
What is the lowest dealing with construction permits: time recorded in Iceland?
The lowest recorded value was 84 days in 2008.
How does Iceland rank for dealing with construction permits: time?
Iceland ranks 163rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Iceland?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Iceland data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.