Brunei Darussalam vs Mexico: Dealing with construction permits: Time

Brunei Darussalam
83 days
in 2019
Mexico
82.12 days
in 2019
Brunei Darussalam rank
164th
Mexico rank
165th

Dealing with construction permits: Time over time

  • Brunei Darussalam
  • Mexico
050100150200520122019

How they compare

Brunei Darussalam currently reports 83 days against 82.12 days in Mexico, a difference of 0.88 days.

The two have swapped places 1 time across 14 shared years of data; in 2006 it was Mexico ahead.

Brunei Darussalam ranks 164th and Mexico ranks 165th of 185 countries.

Across the 2 decades both report, Brunei Darussalam averaged higher in 1 and Mexico in 1.

Head to head by decade

Decade Brunei Darussalam Mexico Difference Ahead
2000s 119 days 163 days 44 days Mexico
2010s 100 days 99.51 days 0.487 days Brunei Darussalam

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brunei Darussalam or Mexico?
Brunei Darussalam, at 83 days against 82.12 days in Mexico as of 2019.
What is the difference in dealing with construction permits: time between Brunei Darussalam and Mexico?
0.88 days, with Brunei Darussalam ahead.
How many years of comparable data are there for Brunei Darussalam and Mexico?
14 years are reported by both, from 2006 to 2019.
How do Brunei Darussalam and Mexico rank globally for dealing with construction permits: time?
Brunei Darussalam ranks 164th and Mexico ranks 165th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.