Dealing with construction permits: Time in Mexico
Mexico: Dealing with construction permits: Time was 82.12 days in 2019. ▼ Falling
Dealing with construction permits: Time in Mexico, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Mexico is 82.12 days, measured in 2019. That is the lowest value across all 15 years on record.
The figure is down 49.6% over ten years.
Over the whole period, dealing with construction permits: time in Mexico peaked at 163 days in 2005 and was at its lowest, 82.12 days, in 2016.
Mexico ranks 165th of 185 countries on this measure, in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 163 days | 163 days | 163 days | 5 |
| 2010s | 99.51 days | 82.12 days | 163 days | 10 |
Countries ranked near Mexico
- 162 Micronesia, Fed. Sts. 85 days compare
- 163 Iceland 84 days compare
- 164 Brunei Darussalam 83 days compare
- 166 Taiwan 82 days compare
- 167 United States 80.6 days compare
- 168 Tonga 77 days compare
More private sector data for Mexico
- Merchandise trade 73.5% (2025)
- Food imports 6.3% (2025)
- Manufactures imports 78.0% (2025)
- Merchandise imports 683.02 billion current US$ (2025)
- Food exports 7.5% (2025)
- Manufactures exports 81.2% (2025)
- Merchandise exports 664.84 billion current US$ (2025)
- Commercial service exports 63.79 billion current US$ (2025)
- Transport services 34.1% (2025)
- Computer, communications and other services 31.8% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Mexico?
- Dealing with construction permits: time in Mexico was 82.12 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Mexico?
- The highest recorded value was 163 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Mexico?
- The lowest recorded value was 82.12 days in 2016.
- How does Mexico rank for dealing with construction permits: time?
- Mexico ranks 165th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Mexico?
- Over the last ten years it is down 49.6%. The long-run trend across the full record is falling.
- Where does this Mexico data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.