Brunei vs Micronesia (country): Dealing with construction permits: Time

Brunei
83 days
in 2019
Micronesia (country)
85 days
in 2019
Brunei rank
164th
Micronesia (country) rank
162nd

Dealing with construction permits: Time over time

  • Brunei
  • Micronesia (country)
050100150200520122019

How they compare

Micronesia (country) currently reports 85 days against 83 days in Brunei, a difference of 2 days.

The two have swapped places 1 time across 14 shared years of data; in 2006 it was Brunei ahead.

Brunei ranks 164th and Micronesia (country) ranks 162nd of 185 countries.

Brunei has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei Micronesia (country) Difference Ahead
2000s 119 days 85 days 34 days Brunei
2010s 100 days 85 days 15 days Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brunei or Micronesia (country)?
Micronesia (country), at 85 days against 83 days in Brunei as of 2019.
What is the difference in dealing with construction permits: time between Brunei and Micronesia (country)?
2 days, with Micronesia (country) ahead.
How many years of comparable data are there for Brunei and Micronesia (country)?
14 years are reported by both, from 2006 to 2019.
How do Brunei and Micronesia (country) rank globally for dealing with construction permits: time?
Brunei ranks 164th and Micronesia (country) ranks 162nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.