Dealing with construction permits: Time in Micronesia (country)
Micronesia (country): Dealing with construction permits: Time was 85 days in 2019. ▬ Flat
Dealing with construction permits: Time in Micronesia (country), 2005–2019
Source: World Bank. Measured in days.
Analysis
Micronesia (country) recorded 85 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Micronesia (country) peaked at 85 days in 2005 and was at its lowest, 85 days, in 2005.
Micronesia (country) ranks 162nd of 185 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 85 days | 85 days | 85 days | 5 |
| 2010s | 85 days | 85 days | 85 days | 10 |
Countries ranked near Micronesia (country)
More private sector data for Micronesia (country)
- Merchandise trade 83.5% (2025)
- Food imports 27.8% (2013)
- Manufactures imports 36.1% (2013)
- Merchandise imports 310.00 million current US$ (2025)
- Food exports 99.2% (2013)
- Manufactures exports 0.5% (2013)
- Merchandise exports 109.00 million current US$ (2025)
- Commercial service exports 33.42 million current US$ (2014)
- Transport services 56.9% (2014)
- Computer, communications and other services 24.2% (2014)
Frequently asked questions
- What is dealing with construction permits: time in Micronesia (country)?
- Dealing with construction permits: time in Micronesia (country) was 85 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Micronesia (country)?
- The highest recorded value was 85 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Micronesia (country)?
- The lowest recorded value was 85 days in 2005.
- How does Micronesia (country) rank for dealing with construction permits: time?
- Micronesia (country) ranks 162nd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Micronesia (country)?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Micronesia (country) data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.