Dealing with construction permits: Time (days) (Time days) in Micronesia (country)

Micronesia (country): Dealing with construction permits: Time was 85 days in 2019. ▬ Flat

Latest (2019)
85 days
Change on year
unchanged
World rank
165th
of 188 countries
All-time high
85 days
in 2005
All-time low
85 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Micronesia (country), 2005–2019

0204060802005201220192005: 85 days2006: 85 days2007: 85 days2008: 85 days2009: 85 days2010: 85 days2011: 85 days2012: 85 days2013: 85 days2014: 85 days2015: 85 days2016: 85 days2017: 85 days2018: 85 days2019: 85 days

Source: World Bank. Measured in days.

Analysis

Micronesia (country) recorded 85 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Micronesia (country) peaked at 85 days in 2005 and was at its lowest, 85 days, in 2005.

Micronesia (country) ranks 165th of 188 countries on this measure, in the bottom quarter.

Dealing with construction permits: Time in Micronesia (country), year by year

Annual values for Dealing with construction permits: Time (days) in Micronesia (country), 2005 to 2019.
Year days Change
2005 85 days —
2006 85 days +0.0%
2007 85 days +0.0%
2008 85 days +0.0%
2009 85 days +0.0%
2010 85 days +0.0%
2011 85 days +0.0%
2012 85 days +0.0%
2013 85 days +0.0%
2014 85 days +0.0%
2015 85 days +0.0%
2016 85 days +0.0%
2017 85 days +0.0%
2018 85 days +0.0%
2019 85 days +0.0%

Micronesia (country) compared with similar countries

  • Micronesia (country)'s 85 days is below the median for upper middle income countries, which is 131 days, 65% of the median. (55 countries reporting)
  • Micronesia (country)'s 85 days is below the median for East Asia & Pacific, which is 103.67 days, 82% of the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 85 days 85 days 85 days 5
2010s 85 days 85 days 85 days 10

Countries ranked near Micronesia (country)

  1. 163 Sri Lanka 86 days compare
  2. 163 United Kingdom 86 days compare
  3. 166 Iceland 84 days compare
  4. 167 Brunei 83 days compare
  5. 168 Mexico 82.12 days compare

See the full ranking of 188 places →

More private sector data for Micronesia (country)

All data for Micronesia (country) →

Frequently asked questions

What is dealing with construction permits: time in Micronesia (country)?
Dealing with construction permits: time in Micronesia (country) was 85 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Micronesia (country)?
The highest recorded value was 85 days in 2005.
What is the lowest dealing with construction permits: time recorded in Micronesia (country)?
The lowest recorded value was 85 days in 2005.
How does Micronesia (country) rank for dealing with construction permits: time?
Micronesia (country) ranks 165th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Micronesia (country)?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Micronesia (country) data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Micronesia (country). Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/micronesia-fed-sts/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/micronesia-fed-sts/">Dealing with construction permits: Time in Micronesia (country)</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.