Brunei vs United States: Dealing with construction permits: Time (days) (Time days)

Brunei
83 days
in 2019
United States
80.6 days
in 2019
Brunei rank
167th
United States rank
170th

Dealing with construction permits: Time (days) (Time days) over time

  • Brunei
  • United States
050100150200520122019

How they compare

Brunei currently reports 83 days against 80.6 days in United States, a difference of 2.4 days.

Across all 14 years both countries report, Brunei has been ahead every year.

Brunei ranks 167th and United States ranks 170th of 188 countries.

Brunei has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei United States Difference Ahead
2000s 119 days 59 days 60 days Brunei
2010s 100 days 83.12 days 16.88 days Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brunei or United States?
Brunei, at 83 days against 80.6 days in United States as of 2019.
What is the difference in dealing with construction permits: time between Brunei and United States?
2.4 days, with Brunei ahead.
How many years of comparable data are there for Brunei and United States?
14 years are reported by both, from 2006 to 2019.
How do Brunei and United States rank globally for dealing with construction permits: time?
Brunei ranks 167th and United States ranks 170th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei vs United States: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/brunei-darussalam/united-states/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/brunei-darussalam/united-states/">Brunei vs United States: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.