Dealing with construction permits: Time in United States

United States: Dealing with construction permits: Time was 80.6 days in 2019. ▲ Rising

Latest (2019)
80.6 days
Change on year
unchanged
World rank
167th
of 185 countries
All-time high
89 days
in 2010
All-time low
59 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in United States, 2005–2019

0204060802005201220192005: 59 days2006: 59 days2007: 59 days2008: 59 days2009: 59 days2010: 89 days2011: 89 days2012: 89 days2013: 80.6 days2014: 80.6 days2015: 80.6 days2016: 80.6 days2017: 80.6 days2018: 80.6 days2019: 80.6 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in United States stood at 80.6 days.

Compared with earlier readings it is up 36.6% over ten years.

Over the whole period, dealing with construction permits: time in United States peaked at 89 days in 2010 and was at its lowest, 59 days, in 2005.

That places United States 167th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 59 days 59 days 59 days 5
2010s 83.12 days 80.6 days 89 days 10

Countries ranked near United States

  1. 164 Brunei Darussalam 83 days compare
  2. 165 Mexico 82.12 days compare
  3. 166 Taiwan 82 days compare
  4. 168 Tonga 77 days compare
  5. 169 Lithuania 74 days compare
  6. 170 Ukraine 72.5 days compare

See the full ranking of 187 places →

More private sector data for United States

All data for United States →

Frequently asked questions

What is dealing with construction permits: time in United States?
Dealing with construction permits: time in United States was 80.6 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in United States?
The highest recorded value was 89 days in 2010.
What is the lowest dealing with construction permits: time recorded in United States?
The lowest recorded value was 59 days in 2005.
How does United States rank for dealing with construction permits: time?
United States ranks 167th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in United States?
Over the last ten years it is up 36.6%. The long-run trend across the full record is rising.
Where does this United States data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.