Burkina Faso vs Democratic Republic of Congo: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Burkina Faso
- Democratic Republic of Congo
How they compare
Democratic Republic of Congo currently reports 122 days against 121 days in Burkina Faso, a difference of 1 days.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Democratic Republic of Congo ahead.
Burkina Faso ranks 111th and Democratic Republic of Congo ranks 110th of 185 countries.
Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Burkina Faso | Democratic Republic of Congo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 188 days | 239 days | 51 days | Democratic Republic of Congo |
| 2010s | 121 days | 126.4 days | 5.4 days | Democratic Republic of Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Burkina Faso or Democratic Republic of Congo?
- Democratic Republic of Congo, at 122 days against 121 days in Burkina Faso as of 2019.
- What is the difference in dealing with construction permits: time between Burkina Faso and Democratic Republic of Congo?
- 1 days, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Burkina Faso and Democratic Republic of Congo?
- 15 years are reported by both, from 2005 to 2019.
- How do Burkina Faso and Democratic Republic of Congo rank globally for dealing with construction permits: time?
- Burkina Faso ranks 111th and Democratic Republic of Congo ranks 110th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.