Burkina Faso vs Philippines: Dealing with construction permits: Time

Burkina Faso
121 days
in 2019
Philippines
120 days
in 2019
Burkina Faso rank
111th
Philippines rank
114th

Dealing with construction permits: Time over time

  • Burkina Faso
  • Philippines
050100150200200520122019

How they compare

Burkina Faso currently reports 121 days against 120 days in Philippines, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Burkina Faso ahead.

Burkina Faso ranks 111th and Philippines ranks 114th of 185 countries.

Across the 2 decades both report, Burkina Faso averaged higher in 1 and Philippines in 1.

Head to head by decade

Decade Burkina Faso Philippines Difference Ahead
2000s 188 days 128.8 days 59.2 days Burkina Faso
2010s 121 days 123.8 days 2.8 days Philippines

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Burkina Faso or Philippines?
Burkina Faso, at 121 days against 120 days in Philippines as of 2019.
What is the difference in dealing with construction permits: time between Burkina Faso and Philippines?
1 days, with Burkina Faso ahead.
How many years of comparable data are there for Burkina Faso and Philippines?
15 years are reported by both, from 2005 to 2019.
How do Burkina Faso and Philippines rank globally for dealing with construction permits: time?
Burkina Faso ranks 111th and Philippines ranks 114th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Philippines: Dealing with construction permits: Time. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/burkina-faso/philippines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/burkina-faso/philippines/">Burkina Faso vs Philippines: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.