Burundi vs Hong Kong: Dealing with construction permits: Time (days) (Time days)

Burundi
70 days
in 2019
Hong Kong
69 days
in 2019
Burundi rank
175th
Hong Kong rank
176th

Dealing with construction permits: Time (days) (Time days) over time

  • Burundi
  • Hong Kong
50100150200200520122019

How they compare

Burundi currently reports 70 days against 69 days in Hong Kong, a difference of 1 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Hong Kong ahead.

Burundi ranks 175th and Hong Kong ranks 176th of 188 countries.

Across the 2 decades both report, Burundi averaged higher in 1 and Hong Kong in 1.

Head to head by decade

Decade Burundi Hong Kong Difference Ahead
2000s 136 days 180.2 days 44.2 days Hong Kong
2010s 97.7 days 74.1 days 23.6 days Burundi

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Burundi or Hong Kong?
Burundi, at 70 days against 69 days in Hong Kong as of 2019.
What is the difference in dealing with construction permits: time between Burundi and Hong Kong?
1 days, with Burundi ahead.
How many years of comparable data are there for Burundi and Hong Kong?
15 years are reported by both, from 2005 to 2019.
How do Burundi and Hong Kong rank globally for dealing with construction permits: time?
Burundi ranks 175th and Hong Kong ranks 176th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burundi vs Hong Kong: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/burundi/hong-kong-sar-china/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/burundi/hong-kong-sar-china/">Burundi vs Hong Kong: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.