Dealing with construction permits: Time in Burundi

Burundi: Dealing with construction permits: Time was 70 days in 2019. ▼ Falling

Latest (2019)
70 days
Change on year
unchanged
World rank
172nd
of 185 countries
All-time high
136 days
in 2005
All-time low
70 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Burundi, 2005–2019

0501001502005201220192005: 136 days2006: 136 days2007: 136 days2008: 136 days2009: 136 days2010: 136 days2011: 136 days2012: 99 days2013: 99 days2014: 99 days2015: 99 days2016: 99 days2017: 70 days2018: 70 days2019: 70 days

Source: World Bank. Measured in days.

Analysis

Burundi recorded 70 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 48.5% over ten years.

Over the whole period, dealing with construction permits: time in Burundi peaked at 136 days in 2005 and was at its lowest, 70 days, in 2017.

That places Burundi 172nd out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 136 days 136 days 136 days 5
2010s 97.7 days 70 days 136 days 10

Countries ranked near Burundi

  1. 169 Lithuania 74 days compare
  2. 170 Ukraine 72.5 days compare
  3. 171 Bahrain 71 days compare
  4. 173 Hong Kong 69 days compare
  5. 174 Sao Tome and Principe 67 days compare
  6. 175 Jordan 66 days compare

See the full ranking of 187 places →

More private sector data for Burundi

All data for Burundi →

Frequently asked questions

What is dealing with construction permits: time in Burundi?
Dealing with construction permits: time in Burundi was 70 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Burundi?
The highest recorded value was 136 days in 2005.
What is the lowest dealing with construction permits: time recorded in Burundi?
The lowest recorded value was 70 days in 2017.
How does Burundi rank for dealing with construction permits: time?
Burundi ranks 172nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Burundi?
Over the last ten years it is down 48.5%. The long-run trend across the full record is falling.
Where does this Burundi data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.