Dealing with construction permits: Time (days) (Time days) in Burundi

Burundi: Dealing with construction permits: Time was 70 days in 2019. ▼ Falling

Latest (2019)
70 days
Change on year
unchanged
World rank
175th
of 188 countries
All-time high
136 days
in 2005
All-time low
70 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Burundi, 2005–2019

0501001502005201220192005: 136 days2006: 136 days2007: 136 days2008: 136 days2009: 136 days2010: 136 days2011: 136 days2012: 99 days2013: 99 days2014: 99 days2015: 99 days2016: 99 days2017: 70 days2018: 70 days2019: 70 days

Source: World Bank. Measured in days.

Analysis

Burundi recorded 70 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 48.5% over ten years.

Over the whole period, dealing with construction permits: time in Burundi peaked at 136 days in 2005 and was at its lowest, 70 days, in 2017.

That places Burundi 175th out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Burundi, year by year

Annual values for Dealing with construction permits: Time (days) in Burundi, 2005 to 2019.
Year days Change
2005 136 days —
2006 136 days +0.0%
2007 136 days +0.0%
2008 136 days +0.0%
2009 136 days +0.0%
2010 136 days +0.0%
2011 136 days +0.0%
2012 99 days -27.2%
2013 99 days +0.0%
2014 99 days +0.0%
2015 99 days +0.0%
2016 99 days +0.0%
2017 70 days -29.3%
2018 70 days +0.0%
2019 70 days +0.0%

Burundi compared with similar countries

  • Burundi's 70 days is below the median for low income countries, which is 133.5 days, 52% of the median. (22 countries reporting)
  • Burundi's 70 days is below the median for Sub-Saharan Africa, which is 143.5 days, 49% of the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 136 days 136 days 136 days 5
2010s 97.7 days 70 days 136 days 10

Countries ranked near Burundi

  1. 172 Lithuania 74 days compare
  2. 173 Ukraine 72.5 days compare
  3. 174 Bahrain 71 days compare
  4. 176 Hong Kong 69 days compare
  5. 177 Sao Tome and Principe 67 days compare
  6. 178 Jordan 66 days compare

See the full ranking of 188 places →

More private sector data for Burundi

All data for Burundi →

Frequently asked questions

What is dealing with construction permits: time in Burundi?
Dealing with construction permits: time in Burundi was 70 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Burundi?
The highest recorded value was 136 days in 2005.
What is the lowest dealing with construction permits: time recorded in Burundi?
The lowest recorded value was 70 days in 2017.
How does Burundi rank for dealing with construction permits: time?
Burundi ranks 175th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Burundi?
Over the last ten years it is down 48.5%. The long-run trend across the full record is falling.
Where does this Burundi data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Burundi. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/burundi/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/burundi/">Dealing with construction permits: Time in Burundi</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.