Dealing with construction permits: Time (days) (Time days) in Hong Kong

Hong Kong: Dealing with construction permits: Time was 69 days in 2019. ◆ Volatile

Latest (2019)
69 days
Change on year
down 4.2%
World rank
176th
of 188 countries
All-time high
216 days
in 2005
All-time low
69 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Hong Kong, 2005–2019

501001502002005201220192005: 216 days2006: 216 days2007: 216 days2008: 174 days2009: 79 days2010: 79 days2011: 79 days2012: 77 days2013: 77 days2014: 72 days2015: 72 days2016: 72 days2017: 72 days2018: 72 days2019: 69 days

Source: World Bank. Measured in days.

Analysis

Hong Kong recorded 69 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 4.2% on the previous year and down 12.7% over ten years.

Over the whole period, dealing with construction permits: time in Hong Kong peaked at 216 days in 2005 and was at its lowest, 69 days, in 2019.

Hong Kong ranks 176th of 188 countries on this measure, in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Time in Hong Kong, year by year

Annual values for Dealing with construction permits: Time (days) in Hong Kong, 2005 to 2019.
Year days Change
2005 216 days —
2006 216 days +0.0%
2007 216 days +0.0%
2008 174 days -19.4%
2009 79 days -54.6%
2010 79 days +0.0%
2011 79 days +0.0%
2012 77 days -2.5%
2013 77 days +0.0%
2014 72 days -6.5%
2015 72 days +0.0%
2016 72 days +0.0%
2017 72 days +0.0%
2018 72 days +0.0%
2019 69 days -4.2%

Hong Kong compared with similar countries

  • Hong Kong's 69 days is below the median for high income countries, which is 144.75 days, 48% of the median. (62 countries reporting)
  • Hong Kong's 69 days is below the median for East Asia & Pacific, which is 103.67 days, 67% of the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 180.2 days 79 days 216 days 5
2010s 74.1 days 69 days 79 days 10

Countries ranked near Hong Kong

  1. 173 Ukraine 72.5 days compare
  2. 174 Bahrain 71 days compare
  3. 175 Burundi 70 days compare
  4. 177 Sao Tome and Principe 67 days compare
  5. 178 Jordan 66 days compare
  6. 179 Finland 65 days compare

See the full ranking of 188 places →

More private sector data for Hong Kong

All data for Hong Kong →

Frequently asked questions

What is dealing with construction permits: time in Hong Kong?
Dealing with construction permits: time in Hong Kong was 69 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Hong Kong?
The highest recorded value was 216 days in 2005.
What is the lowest dealing with construction permits: time recorded in Hong Kong?
The lowest recorded value was 69 days in 2019.
How does Hong Kong rank for dealing with construction permits: time?
Hong Kong ranks 176th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Hong Kong?
Over the last ten years it is down 12.7%. The long-run trend across the full record is volatile.
Where does this Hong Kong data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Hong Kong. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/hong-kong-sar-china/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/hong-kong-sar-china/">Dealing with construction permits: Time in Hong Kong</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.