Dealing with construction permits: Time in Hong Kong

Hong Kong: Dealing with construction permits: Time was 69 days in 2019. ◆ Volatile

Latest (2019)
69 days
Change on year
down 4.2%
World rank
173rd
of 185 countries
All-time high
216 days
in 2005
All-time low
69 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Hong Kong, 2005–2019

501001502002005201220192005: 216 days2006: 216 days2007: 216 days2008: 174 days2009: 79 days2010: 79 days2011: 79 days2012: 77 days2013: 77 days2014: 72 days2015: 72 days2016: 72 days2017: 72 days2018: 72 days2019: 69 days

Source: World Bank. Measured in days.

Analysis

Hong Kong recorded 69 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 4.2% on the previous year and down 12.7% over ten years.

Over the whole period, dealing with construction permits: time in Hong Kong peaked at 216 days in 2005 and was at its lowest, 69 days, in 2019.

Hong Kong ranks 173rd of 185 countries on this measure, in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 180.2 days 79 days 216 days 5
2010s 74.1 days 69 days 79 days 10

Countries ranked near Hong Kong

  1. 170 Ukraine 72.5 days compare
  2. 171 Bahrain 71 days compare
  3. 172 Burundi 70 days compare
  4. 174 Sao Tome and Principe 67 days compare
  5. 175 Jordan 66 days compare
  6. 176 Finland 65 days compare

See the full ranking of 187 places →

More private sector data for Hong Kong

All data for Hong Kong →

Frequently asked questions

What is dealing with construction permits: time in Hong Kong?
Dealing with construction permits: time in Hong Kong was 69 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Hong Kong?
The highest recorded value was 216 days in 2005.
What is the lowest dealing with construction permits: time recorded in Hong Kong?
The lowest recorded value was 69 days in 2019.
How does Hong Kong rank for dealing with construction permits: time?
Hong Kong ranks 173rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Hong Kong?
Over the last ten years it is down 12.7%. The long-run trend across the full record is volatile.
Where does this Hong Kong data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.