Cabo Verde vs Kazakhstan: Dealing with construction permits: Time

Cabo Verde
101 days
in 2019
Kazakhstan
102.5 days
in 2019
Cabo Verde rank
139th
Kazakhstan rank
136th

Dealing with construction permits: Time over time

  • Cabo Verde
  • Kazakhstan
0100200300200520122019

How they compare

Kazakhstan currently reports 102.5 days against 101 days in Cabo Verde, a difference of 1.5 days.

Across all 15 years both countries report, Kazakhstan has been ahead every year.

Cabo Verde ranks 139th and Kazakhstan ranks 136th of 185 countries.

Kazakhstan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cabo Verde Kazakhstan Difference Ahead
2000s 161 days 259.4 days 98.4 days Kazakhstan
2010s 126.3 days 168.85 days 42.55 days Kazakhstan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cabo Verde or Kazakhstan?
Kazakhstan, at 102.5 days against 101 days in Cabo Verde as of 2019.
What is the difference in dealing with construction permits: time between Cabo Verde and Kazakhstan?
1.5 days, with Kazakhstan ahead.
How many years of comparable data are there for Cabo Verde and Kazakhstan?
15 years are reported by both, from 2005 to 2019.
How do Cabo Verde and Kazakhstan rank globally for dealing with construction permits: time?
Cabo Verde ranks 139th and Kazakhstan ranks 136th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.