Cape Verde vs Montenegro: Dealing with construction permits: Time (days) (Time days)

Cape Verde
101 days
in 2019
Montenegro
102 days
in 2019
Cape Verde rank
142nd
Montenegro rank
140th

Dealing with construction permits: Time (days) (Time days) over time

  • Cape Verde
  • Montenegro
050100150200250200520122019

How they compare

Montenegro currently reports 102 days against 101 days in Cape Verde, a difference of 1 days.

The two have swapped places 2 times across 14 shared years of data; in 2006 it was Montenegro ahead.

Cape Verde ranks 142nd and Montenegro ranks 140th of 188 countries.

Montenegro has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cape Verde Montenegro Difference Ahead
2000s 161 days 211.25 days 50.25 days Montenegro
2010s 126.3 days 168.4 days 42.1 days Montenegro

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cape Verde or Montenegro?
Montenegro, at 102 days against 101 days in Cape Verde as of 2019.
What is the difference in dealing with construction permits: time between Cape Verde and Montenegro?
1 days, with Montenegro ahead.
How many years of comparable data are there for Cape Verde and Montenegro?
14 years are reported by both, from 2006 to 2019.
How do Cape Verde and Montenegro rank globally for dealing with construction permits: time?
Cape Verde ranks 142nd and Montenegro ranks 140th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cape Verde vs Montenegro: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/cabo-verde/montenegro/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/cabo-verde/montenegro/">Cape Verde vs Montenegro: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.