Dealing with construction permits: Time in Montenegro
Montenegro: Dealing with construction permits: Time was 102 days in 2019. ▼ Falling
Dealing with construction permits: Time in Montenegro, 2006–2019
Source: World Bank. Measured in days.
Analysis
Montenegro recorded 102 days for dealing with construction permits: time in 2019. That is the lowest value across all 14 years on record.
That represents a change of down 4.7% on the previous year and down 55.5% over ten years.
Over the whole period, dealing with construction permits: time in Montenegro peaked at 229 days in 2009 and was at its lowest, 102 days, in 2019.
That places Montenegro 137th out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 14 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 211.25 days | 195 days | 229 days | 4 |
| 2010s | 168.4 days | 102 days | 229 days | 10 |
Countries ranked near Montenegro
- 134 Estonia 103 days compare
- 134 Kuwait 103 days compare
- 136 Kazakhstan 102.5 days compare
- 137 Botswana 102 days compare
- 139 Cape Verde 101 days compare
- 140 Saudi Arabia 100 days compare
- 140 Turkey 100 days compare
More private sector data for Montenegro
- Merchandise trade 61.8% (2025)
- Food imports 23.6% (2024)
- Manufactures imports 63.7% (2024)
- Merchandise imports 5.06 billion current US$ (2025)
- Food exports 16.8% (2024)
- Manufactures exports 35.1% (2024)
- Merchandise exports 646.00 million current US$ (2025)
- Commercial service exports 3.07 billion current US$ (2025)
- Transport services 51.7% (2025)
- Computer, communications and other services 38.2% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Montenegro?
- Dealing with construction permits: time in Montenegro was 102 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Montenegro?
- The highest recorded value was 229 days in 2009.
- What is the lowest dealing with construction permits: time recorded in Montenegro?
- The lowest recorded value was 102 days in 2019.
- How does Montenegro rank for dealing with construction permits: time?
- Montenegro ranks 137th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Montenegro?
- Over the last ten years it is down 55.5%. The long-run trend across the full record is falling.
- Where does this Montenegro data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.