Cape Verde vs Turkey: Dealing with construction permits: Time

Cape Verde
101 days
in 2019
Turkey
100 days
in 2019
Cape Verde rank
139th
Turkey rank
140th

Dealing with construction permits: Time over time

  • Cape Verde
  • Turkey
050100150200520122019

How they compare

Cape Verde currently reports 101 days against 100 days in Turkey, a difference of 1 days.

Across all 15 years both countries report, Cape Verde has been ahead every year.

Cape Verde ranks 139th and Turkey ranks 140th of 185 countries.

Cape Verde has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cape Verde Turkey Difference Ahead
2000s 161 days 139 days 22 days Cape Verde
2010s 126.3 days 109.6 days 16.7 days Cape Verde

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cape Verde or Turkey?
Cape Verde, at 101 days against 100 days in Turkey as of 2019.
What is the difference in dealing with construction permits: time between Cape Verde and Turkey?
1 days, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Turkey?
15 years are reported by both, from 2005 to 2019.
How do Cape Verde and Turkey rank globally for dealing with construction permits: time?
Cape Verde ranks 139th and Turkey ranks 140th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.