Dealing with construction permits: Time in Turkiye
Turkiye: Dealing with construction permits: Time was 100 days in 2019. ▼ Falling
Dealing with construction permits: Time in Turkiye, 2005–2019
Source: World Bank. Measured in days.
Analysis
Turkiye recorded 100 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 28.1% over ten years.
Over the whole period, dealing with construction permits: time in Turkiye peaked at 139 days in 2005 and was at its lowest, 100 days, in 2013.
That places Turkiye 140th out of 185 countries with data for 2019, putting it in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 139 days | 139 days | 139 days | 5 |
| 2010s | 109.6 days | 100 days | 139 days | 10 |
Countries ranked near Turkiye
- 137 Botswana 102 days compare
- 137 Montenegro 102 days compare
- 139 Cabo Verde 101 days compare
- 140 Saudi Arabia 100 days compare
- 142 Serbia 99.5 days compare
- 143 Armenia 99 days compare
- 143 Solomon Islands 99 days compare
More private sector data for Turkiye
- Merchandise trade 40.0% (2025)
- Food imports 6.2% (2024)
- Manufactures imports 60.8% (2024)
- Merchandise imports 365.37 billion current US$ (2025)
- Food exports 12.3% (2024)
- Manufactures exports 73.6% (2024)
- Merchandise exports 273.36 billion current US$ (2025)
- Commercial service exports 116.82 billion current US$ (2024)
- Transport services 39.2% (2024)
- Computer, communications and other services 38.4% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Turkiye?
- Dealing with construction permits: time in Turkiye was 100 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Turkiye?
- The highest recorded value was 139 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Turkiye?
- The lowest recorded value was 100 days in 2013.
- How does Turkiye rank for dealing with construction permits: time?
- Turkiye ranks 140th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Turkiye?
- Over the last ten years it is down 28.1%. The long-run trend across the full record is falling.
- Where does this Turkiye data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.