Cambodia vs Cyprus: Dealing with construction permits: Time

Cambodia
652 days
in 2019
Cyprus
507 days
in 2019
Cambodia rank
1st
Cyprus rank
2nd

Dealing with construction permits: Time over time

  • Cambodia
  • Cyprus
0200400600800200520122019

How they compare

Cambodia currently reports 652 days against 507 days in Cyprus, a difference of 145 days.

That makes Cambodia's figure about 1.3 times Cyprus's.

The two have swapped places 1 time across 12 shared years of data; in 2008 it was Cyprus ahead.

Cambodia ranks 1st and Cyprus ranks 2nd of 185 countries.

Across the 2 decades both report, Cambodia averaged higher in 1 and Cyprus in 1.

Head to head by decade

Decade Cambodia Cyprus Difference Ahead
2000s 652 days 677.5 days 25.5 days Cyprus
2010s 652 days 603 days 49 days Cambodia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cambodia or Cyprus?
Cambodia, at 652 days against 507 days in Cyprus as of 2019.
What is the difference in dealing with construction permits: time between Cambodia and Cyprus?
145 days, with Cambodia ahead.
How many years of comparable data are there for Cambodia and Cyprus?
12 years are reported by both, from 2008 to 2019.
How do Cambodia and Cyprus rank globally for dealing with construction permits: time?
Cambodia ranks 1st and Cyprus ranks 2nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.