Dealing with construction permits: Time (days) (Time days) in Cambodia

Cambodia: Dealing with construction permits: Time was 652 days in 2019. ▬ Flat

Latest (2019)
652 days
Change on year
unchanged
World rank
1st
of 188 countries
All-time high
714 days
in 2005
All-time low
652 days
in 2006
Years of data
15
2005–2019

Dealing with construction permits: Time in Cambodia, 2005–2019

02004006008002005201220192005: 714 days2006: 652 days2007: 652 days2008: 652 days2009: 652 days2010: 652 days2011: 652 days2012: 652 days2013: 652 days2014: 652 days2015: 652 days2016: 652 days2017: 652 days2018: 652 days2019: 652 days

Source: World Bank. Measured in days.

Analysis

Cambodia recorded 652 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Cambodia peaked at 714 days in 2005 and was at its lowest, 652 days, in 2006.

That places Cambodia 1st out of 188 countries with data for 2019, putting it in the top 10%.

Dealing with construction permits: Time in Cambodia, year by year

Annual values for Dealing with construction permits: Time (days) in Cambodia, 2005 to 2019.
Year days Change
2005 714 days —
2006 652 days -8.7%
2007 652 days +0.0%
2008 652 days +0.0%
2009 652 days +0.0%
2010 652 days +0.0%
2011 652 days +0.0%
2012 652 days +0.0%
2013 652 days +0.0%
2014 652 days +0.0%
2015 652 days +0.0%
2016 652 days +0.0%
2017 652 days +0.0%
2018 652 days +0.0%
2019 652 days +0.0%

Cambodia compared with similar countries

  • Cambodia's 652 days is above the median for lower middle income countries, which is 159 days, 4.1× the median. (47 countries reporting)
  • Cambodia's 652 days is above the median for East Asia & Pacific, which is 103.67 days, 6.3× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 664.4 days 652 days 714 days 5
2010s 652 days 652 days 652 days 10

Countries ranked near Cambodia

  1. 2 Cyprus 507 days compare
  2. 3 Venezuela 434 days compare
  3. 4 Barbados 377 days compare

See the full ranking of 188 places →

More private sector data for Cambodia

All data for Cambodia →

Frequently asked questions

What is dealing with construction permits: time in Cambodia?
Dealing with construction permits: time in Cambodia was 652 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Cambodia?
The highest recorded value was 714 days in 2005.
What is the lowest dealing with construction permits: time recorded in Cambodia?
The lowest recorded value was 652 days in 2006.
How does Cambodia rank for dealing with construction permits: time?
Cambodia ranks 1st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Cambodia?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Cambodia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Cambodia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/cambodia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/cambodia/">Dealing with construction permits: Time in Cambodia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.