Cameroon vs Germany: Dealing with construction permits: Time

Cameroon
126 days
in 2019
Germany
126 days
in 2019
Cameroon rank
104th
Germany rank
104th

Dealing with construction permits: Time over time

  • Cameroon
  • Germany
050100150200250200520122019

How they compare

Cameroon currently reports 126 days against 126 days in Germany, a difference of 0 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Cameroon ahead.

Cameroon ranks 104th and Germany ranks 104th of 185 countries.

Cameroon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cameroon Germany Difference Ahead
2000s 198.6 days 132.4 days 66.2 days Cameroon
2010s 155.7 days 126 days 29.7 days Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cameroon or Germany?
Cameroon, at 126 days against 126 days in Germany as of 2019.
What is the difference in dealing with construction permits: time between Cameroon and Germany?
0 days, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Germany?
15 years are reported by both, from 2005 to 2019.
How do Cameroon and Germany rank globally for dealing with construction permits: time?
Cameroon ranks 104th and Germany ranks 104th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.