Dealing with construction permits: Time in Germany

Germany: Dealing with construction permits: Time was 126 days in 2019. ▼ Falling

Latest (2019)
126 days
Change on year
unchanged
World rank
104th
of 185 countries
All-time high
158 days
in 2005
All-time low
126 days
in 2006
Years of data
15
2005–2019

Dealing with construction permits: Time in Germany, 2005–2019

0501001502005201220192005: 158 days2006: 126 days2007: 126 days2008: 126 days2009: 126 days2010: 126 days2011: 126 days2012: 126 days2013: 126 days2014: 126 days2015: 126 days2016: 126 days2017: 126 days2018: 126 days2019: 126 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Germany stood at 126 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Germany peaked at 158 days in 2005 and was at its lowest, 126 days, in 2006.

That places Germany 104th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 132.4 days 126 days 158 days 5
2010s 126 days 126 days 126 days 10

Countries ranked near Germany

  1. 101 Algeria 131 days compare
  2. 101 South Sudan 131 days compare
  3. 103 Iran 130 days compare
  4. 104 Cameroon 126 days compare
  5. 106 Oman 125 days compare
  6. 107 Pakistan 124.9 days compare

See the full ranking of 187 places →

More private sector data for Germany

All data for Germany →

Frequently asked questions

What is dealing with construction permits: time in Germany?
Dealing with construction permits: time in Germany was 126 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Germany?
The highest recorded value was 158 days in 2005.
What is the lowest dealing with construction permits: time recorded in Germany?
The lowest recorded value was 126 days in 2006.
How does Germany rank for dealing with construction permits: time?
Germany ranks 104th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Germany?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Germany data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.