Dealing with construction permits: Time (days) (Time days) in Germany

Germany: Dealing with construction permits: Time was 126 days in 2019. ▼ Falling

Latest (2019)
126 days
Change on year
unchanged
World rank
107th
of 188 countries
All-time high
158 days
in 2005
All-time low
126 days
in 2006
Years of data
15
2005–2019

Dealing with construction permits: Time in Germany, 2005–2019

0501001502005201220192005: 158 days2006: 126 days2007: 126 days2008: 126 days2009: 126 days2010: 126 days2011: 126 days2012: 126 days2013: 126 days2014: 126 days2015: 126 days2016: 126 days2017: 126 days2018: 126 days2019: 126 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Germany stood at 126 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Germany peaked at 158 days in 2005 and was at its lowest, 126 days, in 2006.

That places Germany 107th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Germany, year by year

Annual values for Dealing with construction permits: Time (days) in Germany, 2005 to 2019.
Year days Change
2005 158 days —
2006 126 days -20.3%
2007 126 days +0.0%
2008 126 days +0.0%
2009 126 days +0.0%
2010 126 days +0.0%
2011 126 days +0.0%
2012 126 days +0.0%
2013 126 days +0.0%
2014 126 days +0.0%
2015 126 days +0.0%
2016 126 days +0.0%
2017 126 days +0.0%
2018 126 days +0.0%
2019 126 days +0.0%

Germany compared with similar countries

  • Germany's 126 days is below the median for high income countries, which is 144.75 days, 87% of the median. (62 countries reporting)
  • Germany's 126 days is below the median for Europe & Central Asia, which is 156 days, 81% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 132.4 days 126 days 158 days 5
2010s 126 days 126 days 126 days 10

Countries ranked near Germany

  1. 104 Algeria 131 days compare
  2. 104 South Sudan 131 days compare
  3. 106 Iran 130 days compare
  4. 107 Cameroon 126 days compare
  5. 109 Oman 125 days compare
  6. 110 Pakistan 124.9 days compare

See the full ranking of 188 places →

More private sector data for Germany

All data for Germany →

Frequently asked questions

What is dealing with construction permits: time in Germany?
Dealing with construction permits: time in Germany was 126 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Germany?
The highest recorded value was 158 days in 2005.
What is the lowest dealing with construction permits: time recorded in Germany?
The lowest recorded value was 126 days in 2006.
How does Germany rank for dealing with construction permits: time?
Germany ranks 107th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Germany?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Germany data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Germany. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/germany/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/germany/">Dealing with construction permits: Time in Germany</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.