Dealing with construction permits: Time in Germany
Germany: Dealing with construction permits: Time was 126 days in 2019. ▼ Falling
Dealing with construction permits: Time in Germany, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Germany stood at 126 days. That is the lowest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Germany peaked at 158 days in 2005 and was at its lowest, 126 days, in 2006.
That places Germany 104th out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 132.4 days | 126 days | 158 days | 5 |
| 2010s | 126 days | 126 days | 126 days | 10 |
Countries ranked near Germany
More private sector data for Germany
- Merchandise trade 65.5% (2025)
- Food imports 9.2% (2024)
- Manufactures imports 73.4% (2024)
- Merchandise imports 1.54 trillion current US$ (2025)
- Food exports 6.3% (2024)
- Manufactures exports 84.1% (2024)
- Merchandise exports 1.76 trillion current US$ (2025)
- Commercial service exports 512.38 billion current US$ (2025)
- Transport services 19.0% (2025)
- Computer, communications and other services 50.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Germany?
- Dealing with construction permits: time in Germany was 126 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Germany?
- The highest recorded value was 158 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Germany?
- The lowest recorded value was 126 days in 2006.
- How does Germany rank for dealing with construction permits: time?
- Germany ranks 104th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Germany?
- Over the last ten years it is unchanged. The long-run trend across the full record is falling.
- Where does this Germany data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.