Dealing with construction permits: Time in Cameroon

Cameroon: Dealing with construction permits: Time was 126 days in 2019. ▼ Falling

Latest (2019)
126 days
Change on year
down 6.7%
World rank
104th
of 185 countries
All-time high
227 days
in 2009
All-time low
126 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Cameroon, 2005–2019

0501001502002502005201220192005: 199 days2006: 199 days2007: 184 days2008: 184 days2009: 227 days2010: 189 days2011: 189 days2012: 189 days2013: 158 days2014: 151 days2015: 150 days2016: 135 days2017: 135 days2018: 135 days2019: 126 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Cameroon stood at 126 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 6.7% on the previous year and down 44.5% over ten years.

Over the whole period, dealing with construction permits: time in Cameroon peaked at 227 days in 2009 and was at its lowest, 126 days, in 2019.

Cameroon ranks 104th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 198.6 days 184 days 227 days 5
2010s 155.7 days 126 days 189 days 10

Countries ranked near Cameroon

  1. 101 Algeria 131 days compare
  2. 101 South Sudan 131 days compare
  3. 103 Iran 130 days compare
  4. 104 Germany 126 days compare
  5. 106 Oman 125 days compare
  6. 107 Pakistan 124.9 days compare

See the full ranking of 187 places →

More private sector data for Cameroon

All data for Cameroon →

Frequently asked questions

What is dealing with construction permits: time in Cameroon?
Dealing with construction permits: time in Cameroon was 126 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Cameroon?
The highest recorded value was 227 days in 2009.
What is the lowest dealing with construction permits: time recorded in Cameroon?
The lowest recorded value was 126 days in 2019.
How does Cameroon rank for dealing with construction permits: time?
Cameroon ranks 104th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Cameroon?
Over the last ten years it is down 44.5%. The long-run trend across the full record is falling.
Where does this Cameroon data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.