Cameroon vs Oman: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Cameroon
- Oman
How they compare
Cameroon currently reports 126 days against 125 days in Oman, a difference of 1 days.
Across all 15 years both countries report, Cameroon has been ahead every year.
Cameroon ranks 104th and Oman ranks 106th of 185 countries.
Cameroon has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cameroon | Oman | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 198.6 days | 137 days | 61.6 days | Cameroon |
| 2010s | 155.7 days | 126.2 days | 29.5 days | Cameroon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Cameroon or Oman?
- Cameroon, at 126 days against 125 days in Oman as of 2019.
- What is the difference in dealing with construction permits: time between Cameroon and Oman?
- 1 days, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Oman?
- 15 years are reported by both, from 2005 to 2019.
- How do Cameroon and Oman rank globally for dealing with construction permits: time?
- Cameroon ranks 104th and Oman ranks 106th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.