Dealing with construction permits: Time (days) (Time days) in Oman

Oman: Dealing with construction permits: Time was 125 days in 2019. ▼ Falling

Latest (2019)
125 days
Change on year
unchanged
World rank
109th
of 188 countries
All-time high
137 days
in 2005
All-time low
125 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Oman, 2005–2019

0501001502005201220192005: 137 days2006: 137 days2007: 137 days2008: 137 days2009: 137 days2010: 137 days2011: 125 days2012: 125 days2013: 125 days2014: 125 days2015: 125 days2016: 125 days2017: 125 days2018: 125 days2019: 125 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Oman stood at 125 days. That is the lowest value across all 15 years on record.

That represents a change of down 8.8% over ten years.

Over the whole period, dealing with construction permits: time in Oman peaked at 137 days in 2005 and was at its lowest, 125 days, in 2011.

Oman ranks 109th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Oman, year by year

Annual values for Dealing with construction permits: Time (days) in Oman, 2005 to 2019.
Year days Change
2005 137 days —
2006 137 days +0.0%
2007 137 days +0.0%
2008 137 days +0.0%
2009 137 days +0.0%
2010 137 days +0.0%
2011 125 days -8.8%
2012 125 days +0.0%
2013 125 days +0.0%
2014 125 days +0.0%
2015 125 days +0.0%
2016 125 days +0.0%
2017 125 days +0.0%
2018 125 days +0.0%
2019 125 days +0.0%

Oman compared with similar countries

  • Oman's 125 days is below the median for high income countries, which is 144.75 days, 86% of the median. (62 countries reporting)
  • Oman's 125 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 98% of the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 137 days 137 days 137 days 5
2010s 126.2 days 125 days 137 days 10

Countries ranked near Oman

  1. 106 Iran 130 days compare
  2. 107 Cameroon 126 days compare
  3. 107 Germany 126 days compare
  4. 110 Pakistan 124.9 days compare
  5. 111 Mali 124 days compare
  6. 112 Vanuatu 123 days compare

See the full ranking of 188 places →

More private sector data for Oman

All data for Oman →

Frequently asked questions

What is dealing with construction permits: time in Oman?
Dealing with construction permits: time in Oman was 125 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Oman?
The highest recorded value was 137 days in 2005.
What is the lowest dealing with construction permits: time recorded in Oman?
The lowest recorded value was 125 days in 2011.
How does Oman rank for dealing with construction permits: time?
Oman ranks 109th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Oman?
Over the last ten years it is down 8.8%. The long-run trend across the full record is falling.
Where does this Oman data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Oman. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/oman/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/oman/">Dealing with construction permits: Time in Oman</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.