Cameroon vs South Sudan: Dealing with construction permits: Time

Cameroon
126 days
in 2019
South Sudan
131 days
in 2019
Cameroon rank
104th
South Sudan rank
101st

Dealing with construction permits: Time over time

  • Cameroon
  • South Sudan
050100150200250200520122019

How they compare

South Sudan currently reports 131 days against 126 days in Cameroon, a difference of 5 days.

The two have swapped places 1 time across 8 shared years of data; in 2012 it was Cameroon ahead.

Cameroon ranks 104th and South Sudan ranks 101st of 185 countries.

Cameroon has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Cameroon or South Sudan?
South Sudan, at 131 days against 126 days in Cameroon as of 2019.
What is the difference in dealing with construction permits: time between Cameroon and South Sudan?
5 days, with South Sudan ahead.
How many years of comparable data are there for Cameroon and South Sudan?
8 years are reported by both, from 2012 to 2019.
How do Cameroon and South Sudan rank globally for dealing with construction permits: time?
Cameroon ranks 104th and South Sudan ranks 101st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.