Dealing with construction permits: Time in South Sudan
South Sudan: Dealing with construction permits: Time was 131 days in 2019. ▲ Rising
Dealing with construction permits: Time in South Sudan, 2012–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in South Sudan is 131 days, measured in 2019. That is the highest value across all 8 years on record.
That represents a change of up 5.6% over ten years.
That places South Sudan 101st out of 185 countries with data for 2019, putting it in the middle of the range.
Countries ranked near South Sudan
More private sector data for South Sudan
- Merchandise trade 37.2% (2025)
- Merchandise imports 1.27 billion current US$ (2025)
- Merchandise exports 955.00 million current US$ (2025)
- Commercial service exports 383.32 million current US$ (2023)
- Transport services 63.4% (2023)
- Computer, communications and other services 13.9% (2023)
- Commercial service imports 1.30 billion current US$ (2023)
- Computer, communications and other services 18.4% (2023)
- Travel services 21.2% (2023)
- Travel services 64.4% (2023)
Frequently asked questions
- What is dealing with construction permits: time in South Sudan?
- Dealing with construction permits: time in South Sudan was 131 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in South Sudan?
- The highest recorded value was 131 days in 2018.
- What is the lowest dealing with construction permits: time recorded in South Sudan?
- The lowest recorded value was 124 days in 2012.
- How does South Sudan rank for dealing with construction permits: time?
- South Sudan ranks 101st out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in South Sudan?
- Over the last ten years it is up 5.6%. The long-run trend across the full record is rising.
- Where does this South Sudan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.