Dealing with construction permits: Time in South Sudan

South Sudan: Dealing with construction permits: Time was 131 days in 2019. ▲ Rising

Latest (2019)
131 days
Change on year
unchanged
World rank
101st
of 185 countries
All-time high
131 days
in 2018
All-time low
124 days
in 2012
Years of data
8
2012–2019

Dealing with construction permits: Time in South Sudan, 2012–2019

0501001502012201520192012: 124 days2013: 124 days2014: 124 days2015: 124 days2016: 124 days2017: 124 days2018: 131 days2019: 131 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in South Sudan is 131 days, measured in 2019. That is the highest value across all 8 years on record.

That represents a change of up 5.6% over ten years.

That places South Sudan 101st out of 185 countries with data for 2019, putting it in the middle of the range.

Countries ranked near South Sudan

  1. 98 Colombia 132 days compare
  2. 98 Ecuador 132 days compare
  3. 98 Honduras 132 days compare
  4. 101 Algeria 131 days compare
  5. 103 Iran 130 days compare
  6. 104 Cameroon 126 days compare
  7. 104 Germany 126 days compare

See the full ranking of 187 places →

More private sector data for South Sudan

All data for South Sudan →

Frequently asked questions

What is dealing with construction permits: time in South Sudan?
Dealing with construction permits: time in South Sudan was 131 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in South Sudan?
The highest recorded value was 131 days in 2018.
What is the lowest dealing with construction permits: time recorded in South Sudan?
The lowest recorded value was 124 days in 2012.
How does South Sudan rank for dealing with construction permits: time?
South Sudan ranks 101st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in South Sudan?
Over the last ten years it is up 5.6%. The long-run trend across the full record is rising.
Where does this South Sudan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.