Canada vs Czechia: Dealing with construction permits: Time

Canada
249 days
in 2019
Czechia
246 days
in 2019
Canada rank
18th
Czechia rank
20th

Dealing with construction permits: Time over time

  • Canada
  • Czechia
0100200300200520122019

How they compare

Canada currently reports 249 days against 246 days in Czechia, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Czechia ahead.

Canada ranks 18th and Czechia ranks 20th of 185 countries.

Across the 2 decades both report, Canada averaged higher in 1 and Czechia in 1.

Head to head by decade

Decade Canada Czechia Difference Ahead
2000s 225 days 270 days 45 days Czechia
2010s 246.4 days 246 days 0.4 days Canada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Canada or Czechia?
Canada, at 249 days against 246 days in Czechia as of 2019.
What is the difference in dealing with construction permits: time between Canada and Czechia?
3 days, with Canada ahead.
How many years of comparable data are there for Canada and Czechia?
15 years are reported by both, from 2005 to 2019.
How do Canada and Czechia rank globally for dealing with construction permits: time?
Canada ranks 18th and Czechia ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.