Dealing with construction permits: Time in Canada

Canada: Dealing with construction permits: Time was 249 days in 2019. ▲ Rising

Latest (2019)
249 days
Change on year
unchanged
World rank
18th
of 185 countries
All-time high
249 days
in 2011
All-time low
223 days
in 2006
Years of data
15
2005–2019

Dealing with construction permits: Time in Canada, 2005–2019

0501001502002502005201220192005: 233 days2006: 223 days2007: 223 days2008: 223 days2009: 223 days2010: 223 days2011: 249 days2012: 249 days2013: 249 days2014: 249 days2015: 249 days2016: 249 days2017: 249 days2018: 249 days2019: 249 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Canada is 249 days, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 11.7% over ten years.

Over the whole period, dealing with construction permits: time in Canada peaked at 249 days in 2011 and was at its lowest, 223 days, in 2006.

That places Canada 18th out of 185 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 225 days 223 days 233 days 5
2010s 246.4 days 223 days 249 days 10

Countries ranked near Canada

  1. 15 Romania 260 days compare
  2. 16 Sudan 255 days compare
  3. 17 Trinidad and Tobago 254 days compare
  4. 19 Slovenia 247.5 days compare
  5. 20 Czechia 246 days compare
  6. 20 Uzbekistan 246 days compare

See the full ranking of 187 places →

More private sector data for Canada

All data for Canada →

Frequently asked questions

What is dealing with construction permits: time in Canada?
Dealing with construction permits: time in Canada was 249 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Canada?
The highest recorded value was 249 days in 2011.
What is the lowest dealing with construction permits: time recorded in Canada?
The lowest recorded value was 223 days in 2006.
How does Canada rank for dealing with construction permits: time?
Canada ranks 18th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Canada?
Over the last ten years it is up 11.7%. The long-run trend across the full record is rising.
Where does this Canada data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.