Canada vs Uzbekistan: Dealing with construction permits: Time

Canada
249 days
in 2019
Uzbekistan
246 days
in 2019
Canada rank
18th
Uzbekistan rank
20th

Dealing with construction permits: Time over time

  • Canada
  • Uzbekistan
0100200300200520122019

How they compare

Canada currently reports 249 days against 246 days in Uzbekistan, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Uzbekistan ahead.

Canada ranks 18th and Uzbekistan ranks 20th of 185 countries.

Uzbekistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Canada Uzbekistan Difference Ahead
2000s 225 days 261 days 36 days Uzbekistan
2010s 246.4 days 255.3 days 8.9 days Uzbekistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Canada or Uzbekistan?
Canada, at 249 days against 246 days in Uzbekistan as of 2019.
What is the difference in dealing with construction permits: time between Canada and Uzbekistan?
3 days, with Canada ahead.
How many years of comparable data are there for Canada and Uzbekistan?
15 years are reported by both, from 2005 to 2019.
How do Canada and Uzbekistan rank globally for dealing with construction permits: time?
Canada ranks 18th and Uzbekistan ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.