Dealing with construction permits: Time in Uzbekistan

Uzbekistan: Dealing with construction permits: Time was 246 days in 2019. ▼ Falling

Latest (2019)
246 days
Change on year
unchanged
World rank
20th
of 185 countries
All-time high
261 days
in 2005
All-time low
246 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Uzbekistan, 2005–2019

01002003002005201220192005: 261 days2006: 261 days2007: 261 days2008: 261 days2009: 261 days2010: 261 days2011: 261 days2012: 261 days2013: 258 days2014: 258 days2015: 258 days2016: 258 days2017: 246 days2018: 246 days2019: 246 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Uzbekistan is 246 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 5.7% over ten years.

Over the whole period, dealing with construction permits: time in Uzbekistan peaked at 261 days in 2005 and was at its lowest, 246 days, in 2017.

Uzbekistan ranks 20th of 185 countries on this measure, in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 261 days 261 days 261 days 5
2010s 255.3 days 246 days 261 days 10

Countries ranked near Uzbekistan

  1. 17 Trinidad and Tobago 254 days compare
  2. 18 Canada 249 days compare
  3. 19 Slovenia 247.5 days compare
  4. 20 Czechia 246 days compare
  5. 22 Bolivia 235 days compare
  6. 23 Chad 226 days compare
  7. 23 Guatemala 226 days compare

See the full ranking of 187 places →

More private sector data for Uzbekistan

All data for Uzbekistan →

Frequently asked questions

What is dealing with construction permits: time in Uzbekistan?
Dealing with construction permits: time in Uzbekistan was 246 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Uzbekistan?
The highest recorded value was 261 days in 2005.
What is the lowest dealing with construction permits: time recorded in Uzbekistan?
The lowest recorded value was 246 days in 2017.
How does Uzbekistan rank for dealing with construction permits: time?
Uzbekistan ranks 20th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Uzbekistan?
Over the last ten years it is down 5.7%. The long-run trend across the full record is falling.
Where does this Uzbekistan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.