Chad vs Kosovo (UNSCR 1244): Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- Chad
- Kosovo (UNSCR 1244)
How they compare
Kosovo (UNSCR 1244) currently reports 237 days against 226 days in Chad, a difference of 11 days.
Across all 11 years both countries report, Kosovo (UNSCR 1244) has been ahead every year.
Chad ranks 25th and Kosovo (UNSCR 1244) ranks 22nd of 188 countries.
Kosovo (UNSCR 1244) has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Chad | Kosovo (UNSCR 1244) | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 176 days | 375 days | 199 days | Kosovo (UNSCR 1244) |
| 2010s | 215 days | 267 days | 52 days | Kosovo (UNSCR 1244) |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Chad or Kosovo (UNSCR 1244)?
- Kosovo (UNSCR 1244), at 237 days against 226 days in Chad as of 2019.
- What is the difference in dealing with construction permits: time between Chad and Kosovo (UNSCR 1244)?
- 11 days, with Kosovo (UNSCR 1244) ahead.
- How many years of comparable data are there for Chad and Kosovo (UNSCR 1244)?
- 11 years are reported by both, from 2009 to 2019.
- How do Chad and Kosovo (UNSCR 1244) rank globally for dealing with construction permits: time?
- Chad ranks 25th and Kosovo (UNSCR 1244) ranks 22nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.