Dealing with construction permits: Time (days) (Time days) in Kosovo (UNSCR 1244)
Kosovo (UNSCR 1244): Dealing with construction permits: Time was 237 days in 2019. ▼ Falling
Dealing with construction permits: Time in Kosovo (UNSCR 1244), 2009–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Kosovo (UNSCR 1244) is 237 days, measured in 2019. That is the lowest value across all 11 years on record.
The figure is down 0.8% on the previous year and down 36.8% over ten years.
Over the whole period, dealing with construction permits: time in Kosovo (UNSCR 1244) peaked at 375 days in 2009 and was at its lowest, 237 days, in 2019.
That places Kosovo (UNSCR 1244) 22nd out of 188 countries with data for 2019, putting it in the top quarter.
The long-run direction has been consistently falling across the 11 years of available data.
Dealing with construction permits: Time in Kosovo (UNSCR 1244), year by year
| Year | days | Change |
|---|---|---|
| 2009 | 375 days | — |
| 2010 | 375 days | +0.0% |
| 2011 | 373 days | -0.5% |
| 2012 | 242 days | -35.1% |
| 2013 | 240 days | -0.8% |
| 2014 | 241 days | +0.4% |
| 2015 | 241 days | +0.0% |
| 2016 | 241 days | +0.0% |
| 2017 | 241 days | +0.0% |
| 2018 | 239 days | -0.8% |
| 2019 | 237 days | -0.8% |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 375 days | 375 days | 375 days | 1 |
| 2010s | 267 days | 237 days | 375 days | 10 |
Countries ranked near Kosovo (UNSCR 1244)
More private sector data for Kosovo (UNSCR 1244)
- Commercial service exports 4.87 billion current US$ (2025)
- Transport services 20.0% (2025)
- Computer, communications and other services 18.0% (2025)
- Commercial service imports 2.18 billion current US$ (2025)
- Computer, communications and other services 19.3% (2025)
- Travel services 55.9% (2025)
- Travel services 75.7% (2025)
- Transport services 4.5% (2025)
- Insurance and financial services 6.2% (2025)
- Merchandise imports from economies in the Arab World 1.4% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Kosovo (UNSCR 1244)?
- Dealing with construction permits: time in Kosovo (UNSCR 1244) was 237 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Kosovo (UNSCR 1244)?
- The highest recorded value was 375 days in 2009.
- What is the lowest dealing with construction permits: time recorded in Kosovo (UNSCR 1244)?
- The lowest recorded value was 237 days in 2019.
- How does Kosovo (UNSCR 1244) rank for dealing with construction permits: time?
- Kosovo (UNSCR 1244) ranks 22nd out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Kosovo (UNSCR 1244)?
- Over the last ten years it is down 36.8%. The long-run trend across the full record is falling.
- Where does this Kosovo (UNSCR 1244) data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.