Dealing with construction permits: Time (days) (Time days) in Chad

Chad: Dealing with construction permits: Time was 226 days in 2019. ▲ Rising

Latest (2019)
226 days
Change on year
unchanged
World rank
25th
of 188 countries
All-time high
226 days
in 2014
All-time low
176 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Chad, 2005–2019

0501001502002502005201220192005: 176 days2006: 176 days2007: 176 days2008: 176 days2009: 176 days2010: 176 days2011: 176 days2012: 221 days2013: 221 days2014: 226 days2015: 226 days2016: 226 days2017: 226 days2018: 226 days2019: 226 days

Source: World Bank. Measured in days.

Analysis

Chad recorded 226 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

That represents a change of up 28.4% over ten years.

Over the whole period, dealing with construction permits: time in Chad peaked at 226 days in 2014 and was at its lowest, 176 days, in 2005.

That places Chad 25th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Chad, year by year

Annual values for Dealing with construction permits: Time (days) in Chad, 2005 to 2019.
Year days Change
2005 176 days —
2006 176 days +0.0%
2007 176 days +0.0%
2008 176 days +0.0%
2009 176 days +0.0%
2010 176 days +0.0%
2011 176 days +0.0%
2012 221 days +25.6%
2013 221 days +0.0%
2014 226 days +2.3%
2015 226 days +0.0%
2016 226 days +0.0%
2017 226 days +0.0%
2018 226 days +0.0%
2019 226 days +0.0%

Chad compared with similar countries

  • Chad's 226 days is above the median for low income countries, which is 133.5 days, 1.7× the median. (22 countries reporting)
  • Chad's 226 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.6× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 176 days 176 days 176 days 5
2010s 215 days 176 days 226 days 10

Countries ranked near Chad

  1. 22 Kosovo 237 days compare
  2. 22 Kosovo (UNSCR 1244) 237 days compare
  3. 24 Bolivia 235 days compare
  4. 25 Guatemala 226 days compare
  5. 27 Nicaragua 225 days compare
  6. 28 Suriname 223 days compare

See the full ranking of 188 places →

More private sector data for Chad

All data for Chad →

Frequently asked questions

What is dealing with construction permits: time in Chad?
Dealing with construction permits: time in Chad was 226 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Chad?
The highest recorded value was 226 days in 2014.
What is the lowest dealing with construction permits: time recorded in Chad?
The lowest recorded value was 176 days in 2005.
How does Chad rank for dealing with construction permits: time?
Chad ranks 25th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Chad?
Over the last ten years it is up 28.4%. The long-run trend across the full record is rising.
Where does this Chad data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Chad. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/chad/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/chad/">Dealing with construction permits: Time in Chad</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.