Dealing with construction permits: Time in Chad
Chad: Dealing with construction permits: Time was 226 days in 2019. ▲ Rising
Dealing with construction permits: Time in Chad, 2005–2019
Source: World Bank. Measured in days.
Analysis
Chad recorded 226 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
That represents a change of up 28.4% over ten years.
Over the whole period, dealing with construction permits: time in Chad peaked at 226 days in 2014 and was at its lowest, 176 days, in 2005.
That places Chad 23rd out of 185 countries with data for 2019, putting it in the top quarter.
The long-run direction has been consistently rising across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 176 days | 176 days | 176 days | 5 |
| 2010s | 215 days | 176 days | 226 days | 10 |
Countries ranked near Chad
More private sector data for Chad
- Merchandise trade 28.9% (2025)
- Food imports 24.3% (1995)
- Manufactures imports 56.5% (1995)
- Merchandise imports 2.20 billion current US$ (2025)
- Food exports 16.2% (1975)
- Manufactures exports 7.7% (1975)
- Merchandise exports 4.00 billion current US$ (2025)
- Commercial service exports 23.41 million current US$ (1994)
- Transport services 55.0% (1994)
- Computer, communications and other services 28.6% (1994)
Frequently asked questions
- What is dealing with construction permits: time in Chad?
- Dealing with construction permits: time in Chad was 226 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Chad?
- The highest recorded value was 226 days in 2014.
- What is the lowest dealing with construction permits: time recorded in Chad?
- The lowest recorded value was 176 days in 2005.
- How does Chad rank for dealing with construction permits: time?
- Chad ranks 23rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Chad?
- Over the last ten years it is up 28.4%. The long-run trend across the full record is rising.
- Where does this Chad data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.