Chile vs Israel: Dealing with construction permits: Time (days) (Time days)

Chile
195 days
in 2019
Israel
200 days
in 2019
Chile rank
40th
Israel rank
38th

Dealing with construction permits: Time (days) (Time days) over time

  • Chile
  • Israel
0100200300200520122019

How they compare

Israel currently reports 200 days against 195 days in Chile, a difference of 5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Chile ahead.

Chile ranks 40th and Israel ranks 38th of 188 countries.

Across the 2 decades both report, Chile averaged higher in 1 and Israel in 1.

Head to head by decade

Decade Chile Israel Difference Ahead
2000s 252 days 207 days 45 days Chile
2010s 200.7 days 204.2 days 3.5 days Israel

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Chile or Israel?
Israel, at 200 days against 195 days in Chile as of 2019.
What is the difference in dealing with construction permits: time between Chile and Israel?
5 days, with Israel ahead.
How many years of comparable data are there for Chile and Israel?
15 years are reported by both, from 2005 to 2019.
How do Chile and Israel rank globally for dealing with construction permits: time?
Chile ranks 40th and Israel ranks 38th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chile vs Israel: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/chile/israel/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/chile/israel/">Chile vs Israel: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.