Dealing with construction permits: Time (days) (Time days) in Israel

Israel: Dealing with construction permits: Time was 200 days in 2019. ▬ Flat

Latest (2019)
200 days
Change on year
unchanged
World rank
38th
of 188 countries
All-time high
207 days
in 2005
All-time low
200 days
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Time in Israel, 2005–2019

0501001502002005201220192005: 207 days2006: 207 days2007: 207 days2008: 207 days2009: 207 days2010: 207 days2011: 207 days2012: 207 days2013: 207 days2014: 207 days2015: 207 days2016: 200 days2017: 200 days2018: 200 days2019: 200 days

Source: World Bank. Measured in days.

Analysis

Israel recorded 200 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 3.4% over ten years.

Over the whole period, dealing with construction permits: time in Israel peaked at 207 days in 2005 and was at its lowest, 200 days, in 2016.

Israel ranks 38th of 188 countries on this measure, in the top quarter.

Dealing with construction permits: Time in Israel, year by year

Annual values for Dealing with construction permits: Time (days) in Israel, 2005 to 2019.
Year days Change
2005 207 days —
2006 207 days +0.0%
2007 207 days +0.0%
2008 207 days +0.0%
2009 207 days +0.0%
2010 207 days +0.0%
2011 207 days +0.0%
2012 207 days +0.0%
2013 207 days +0.0%
2014 207 days +0.0%
2015 207 days +0.0%
2016 200 days -3.4%
2017 200 days +0.0%
2018 200 days +0.0%
2019 200 days +0.0%

Israel compared with similar countries

  • Israel's 200 days is above the median for high income countries, which is 144.75 days, 1.4× the median. (62 countries reporting)
  • Israel's 200 days is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 1.6× the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 207 days 207 days 207 days 5
2010s 204.2 days 200 days 207 days 10

Countries ranked near Israel

  1. 35 East Timor 207 days compare
  2. 36 Dominican Republic 206 days compare
  3. 37 Indonesia 200.13 days compare
  4. 39 Afghanistan 199 days compare
  5. 40 Chile 195 days compare
  6. 41 Madagascar 194 days compare

See the full ranking of 188 places →

More private sector data for Israel

All data for Israel →

Frequently asked questions

What is dealing with construction permits: time in Israel?
Dealing with construction permits: time in Israel was 200 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Israel?
The highest recorded value was 207 days in 2005.
What is the lowest dealing with construction permits: time recorded in Israel?
The lowest recorded value was 200 days in 2016.
How does Israel rank for dealing with construction permits: time?
Israel ranks 38th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Israel?
Over the last ten years it is down 3.4%. The long-run trend across the full record is flat.
Where does this Israel data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Israel. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/israel/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/israel/">Dealing with construction permits: Time in Israel</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.