Dealing with construction permits: Time (days) (Time days) in Chile

Chile: Dealing with construction permits: Time was 195 days in 2019. ▼ Falling

Latest (2019)
195 days
Change on year
unchanged
World rank
40th
of 188 countries
All-time high
252 days
in 2005
All-time low
195 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Chile, 2005–2019

01002003002005201220192005: 252 days2006: 252 days2007: 252 days2008: 252 days2009: 252 days2010: 252 days2011: 195 days2012: 195 days2013: 195 days2014: 195 days2015: 195 days2016: 195 days2017: 195 days2018: 195 days2019: 195 days

Source: World Bank. Measured in days.

Analysis

Chile recorded 195 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 22.6% over ten years.

Over the whole period, dealing with construction permits: time in Chile peaked at 252 days in 2005 and was at its lowest, 195 days, in 2011.

Chile ranks 40th of 188 countries on this measure, in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Chile, year by year

Annual values for Dealing with construction permits: Time (days) in Chile, 2005 to 2019.
Year days Change
2005 252 days —
2006 252 days +0.0%
2007 252 days +0.0%
2008 252 days +0.0%
2009 252 days +0.0%
2010 252 days +0.0%
2011 195 days -22.6%
2012 195 days +0.0%
2013 195 days +0.0%
2014 195 days +0.0%
2015 195 days +0.0%
2016 195 days +0.0%
2017 195 days +0.0%
2018 195 days +0.0%
2019 195 days +0.0%

Chile compared with similar countries

  • Chile's 195 days is above the median for high income countries, which is 144.75 days, 1.3× the median. (62 countries reporting)
  • Chile's 195 days is above the median for Latin America & Caribbean, which is 165 days, 1.2× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 252 days 252 days 252 days 5
2010s 200.7 days 195 days 252 days 10

Countries ranked near Chile

  1. 37 Indonesia 200.13 days compare
  2. 38 Israel 200 days compare
  3. 39 Afghanistan 199 days compare
  4. 41 Madagascar 194 days compare
  5. 42 Hungary 192.5 days compare
  6. 43 Latvia 192 days compare

See the full ranking of 188 places →

More private sector data for Chile

All data for Chile →

Frequently asked questions

What is dealing with construction permits: time in Chile?
Dealing with construction permits: time in Chile was 195 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Chile?
The highest recorded value was 252 days in 2005.
What is the lowest dealing with construction permits: time recorded in Chile?
The lowest recorded value was 195 days in 2011.
How does Chile rank for dealing with construction permits: time?
Chile ranks 40th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Chile?
Over the last ten years it is down 22.6%. The long-run trend across the full record is falling.
Where does this Chile data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Chile. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/chile/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/chile/">Dealing with construction permits: Time in Chile</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.