Chile vs Madagascar: Dealing with construction permits: Time

Chile
195 days
in 2019
Madagascar
194 days
in 2019
Chile rank
38th
Madagascar rank
39th

Dealing with construction permits: Time over time

  • Chile
  • Madagascar
0100200300200520122019

How they compare

Chile currently reports 195 days against 194 days in Madagascar, a difference of 1 days.

Across all 15 years both countries report, Chile has been ahead every year.

Chile ranks 38th and Madagascar ranks 39th of 185 countries.

Chile has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Chile Madagascar Difference Ahead
2000s 252 days 155.4 days 96.6 days Chile
2010s 200.7 days 186.2 days 14.5 days Chile

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Chile or Madagascar?
Chile, at 195 days against 194 days in Madagascar as of 2019.
What is the difference in dealing with construction permits: time between Chile and Madagascar?
1 days, with Chile ahead.
How many years of comparable data are there for Chile and Madagascar?
15 years are reported by both, from 2005 to 2019.
How do Chile and Madagascar rank globally for dealing with construction permits: time?
Chile ranks 38th and Madagascar ranks 39th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.