Dealing with construction permits: Time in Madagascar

Madagascar: Dealing with construction permits: Time was 194 days in 2019. ▲ Rising

Latest (2019)
194 days
Change on year
unchanged
World rank
39th
of 185 countries
All-time high
194 days
in 2014
All-time low
143 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Madagascar, 2005–2019

0501001502002005201220192005: 143 days2006: 143 days2007: 143 days2008: 174 days2009: 174 days2010: 174 days2011: 174 days2012: 174 days2013: 176 days2014: 194 days2015: 194 days2016: 194 days2017: 194 days2018: 194 days2019: 194 days

Source: World Bank. Measured in days.

Analysis

Madagascar recorded 194 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

The figure is up 11.5% over ten years.

Over the whole period, dealing with construction permits: time in Madagascar peaked at 194 days in 2014 and was at its lowest, 143 days, in 2005.

That places Madagascar 39th out of 185 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 155.4 days 143 days 174 days 5
2010s 186.2 days 174 days 194 days 10

Countries ranked near Madagascar

  1. 36 Israel 200 days compare
  2. 37 Afghanistan 199 days compare
  3. 38 Chile 195 days compare
  4. 40 Hungary 192.5 days compare
  5. 41 Latvia 192 days compare
  6. 42 Dominica 191 days compare

See the full ranking of 187 places →

More private sector data for Madagascar

All data for Madagascar →

Frequently asked questions

What is dealing with construction permits: time in Madagascar?
Dealing with construction permits: time in Madagascar was 194 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Madagascar?
The highest recorded value was 194 days in 2014.
What is the lowest dealing with construction permits: time recorded in Madagascar?
The lowest recorded value was 143 days in 2005.
How does Madagascar rank for dealing with construction permits: time?
Madagascar ranks 39th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Madagascar?
Over the last ten years it is up 11.5%. The long-run trend across the full record is rising.
Where does this Madagascar data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.