China vs Thailand: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- China
- Thailand
How they compare
Thailand currently reports 113 days against 110.88 days in China, a difference of 2.12 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was China ahead.
China ranks 124th and Thailand ranks 121st of 185 countries.
China has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | China | Thailand | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 392.8 days | 171 days | 221.8 days | China |
| 2010s | 267.39 days | 138.2 days | 129.19 days | China |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, China or Thailand?
- Thailand, at 113 days against 110.88 days in China as of 2019.
- What is the difference in dealing with construction permits: time between China and Thailand?
- 2.12 days, with Thailand ahead.
- How many years of comparable data are there for China and Thailand?
- 15 years are reported by both, from 2005 to 2019.
- How do China and Thailand rank globally for dealing with construction permits: time?
- China ranks 124th and Thailand ranks 121st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.