Dealing with construction permits: Time in Thailand

Thailand: Dealing with construction permits: Time was 113 days in 2019. ▼ Falling

Latest (2019)
113 days
Change on year
down 4.2%
World rank
121st
of 185 countries
All-time high
171 days
in 2005
All-time low
113 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Thailand, 2005–2019

0501001502005201220192005: 171 days2006: 171 days2007: 171 days2008: 171 days2009: 171 days2010: 171 days2011: 171 days2012: 161 days2013: 161 days2014: 133 days2015: 118 days2016: 118 days2017: 118 days2018: 118 days2019: 113 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Thailand stood at 113 days. That is the lowest value across all 15 years on record.

The figure is down 4.2% on the previous year and down 33.9% over ten years.

Over the whole period, dealing with construction permits: time in Thailand peaked at 171 days in 2005 and was at its lowest, 113 days, in 2019.

Thailand ranks 121st of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 171 days 171 days 171 days 5
2010s 138.2 days 113 days 171 days 10

Countries ranked near Thailand

  1. 118 Azerbaijan 116 days compare
  2. 118 Eswatini 116 days compare
  3. 118 Saint Lucia 116 days compare
  4. 121 Seychelles 113 days compare
  5. 121 Uganda 113 days compare
  6. 124 China 110.88 days compare

See the full ranking of 187 places →

More private sector data for Thailand

All data for Thailand →

Frequently asked questions

What is dealing with construction permits: time in Thailand?
Dealing with construction permits: time in Thailand was 113 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Thailand?
The highest recorded value was 171 days in 2005.
What is the lowest dealing with construction permits: time recorded in Thailand?
The lowest recorded value was 113 days in 2019.
How does Thailand rank for dealing with construction permits: time?
Thailand ranks 121st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Thailand?
Over the last ten years it is down 33.9%. The long-run trend across the full record is falling.
Where does this Thailand data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.