Dealing with construction permits: Time in China

China: Dealing with construction permits: Time was 110.88 days in 2019. ▼ Falling

Latest (2019)
110.88 days
Change on year
down 28.3%
World rank
124th
of 185 countries
All-time high
404 days
in 2005
All-time low
110.88 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in China, 2005–2019

1002003004002005201220192005: 404 days2006: 390 days2007: 390 days2008: 390 days2009: 390 days2010: 390 days2011: 387 days2012: 306 days2013: 265.9 days2014: 265.9 days2015: 265.9 days2016: 265.9 days2017: 261.8 days2018: 154.7 days2019: 110.9 days

Source: World Bank. Measured in days.

Analysis

China recorded 110.88 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 28.3% on the previous year and down 71.6% over ten years.

Over the whole period, dealing with construction permits: time in China peaked at 404 days in 2005 and was at its lowest, 110.88 days, in 2019.

That places China 124th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 392.8 days 390 days 404 days 5
2010s 267.39 days 110.88 days 390 days 10

Countries ranked near China

  1. 121 Seychelles 113 days compare
  2. 121 Thailand 113 days compare
  3. 121 Uganda 113 days compare
  4. 125 Norway 109.5 days compare
  5. 126 Japan 108.35 days compare
  6. 127 West Bank and Gaza 108 days compare

See the full ranking of 187 places →

More private sector data for China

All data for China →

Frequently asked questions

What is dealing with construction permits: time in China?
Dealing with construction permits: time in China was 110.88 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in China?
The highest recorded value was 404 days in 2005.
What is the lowest dealing with construction permits: time recorded in China?
The lowest recorded value was 110.88 days in 2019.
How does China rank for dealing with construction permits: time?
China ranks 124th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in China?
Over the last ten years it is down 71.6%. The long-run trend across the full record is falling.
Where does this China data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.