Dealing with construction permits: Time (days) (Time days) in China

China: Dealing with construction permits: Time was 110.88 days in 2019. ▼ Falling

Latest (2019)
110.88 days
Change on year
down 28.3%
World rank
127th
of 188 countries
All-time high
404 days
in 2005
All-time low
110.88 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in China, 2005–2019

1002003004002005201220192005: 404 days2006: 390 days2007: 390 days2008: 390 days2009: 390 days2010: 390 days2011: 387 days2012: 306 days2013: 265.9 days2014: 265.9 days2015: 265.9 days2016: 265.9 days2017: 261.8 days2018: 154.7 days2019: 110.9 days

Source: World Bank. Measured in days.

Analysis

China recorded 110.88 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 28.3% on the previous year and down 71.6% over ten years.

Over the whole period, dealing with construction permits: time in China peaked at 404 days in 2005 and was at its lowest, 110.88 days, in 2019.

That places China 127th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in China, year by year

Annual values for Dealing with construction permits: Time (days) in China, 2005 to 2019.
Year days Change
2005 404 days —
2006 390 days -3.5%
2007 390 days +0.0%
2008 390 days +0.0%
2009 390 days +0.0%
2010 390 days +0.0%
2011 387 days -0.8%
2012 306 days -20.9%
2013 265.9 days -13.1%
2014 265.9 days +0.0%
2015 265.9 days +0.0%
2016 265.9 days +0.0%
2017 261.8 days -1.5%
2018 154.65 days -40.9%
2019 110.88 days -28.3%

China compared with similar countries

  • China's 110.88 days is below the median for upper middle income countries, which is 131 days, 85% of the median. (55 countries reporting)
  • China's 110.88 days is above the median for East Asia & Pacific, which is 103.67 days, 1.1× the median. (28 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in China changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2018 -40.9% 261.8 days 154.65 days
2019 -28.3% 154.65 days 110.88 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 392.8 days 390 days 404 days 5
2010s 267.39 days 110.88 days 390 days 10

Countries ranked near China

  1. 124 Seychelles 113 days compare
  2. 124 Thailand 113 days compare
  3. 124 Uganda 113 days compare
  4. 128 Norway 109.5 days compare
  5. 129 Japan 108.35 days compare
  6. 130 Palestine 108 days compare

See the full ranking of 188 places →

More private sector data for China

All data for China →

Frequently asked questions

What is dealing with construction permits: time in China?
Dealing with construction permits: time in China was 110.88 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in China?
The highest recorded value was 404 days in 2005.
What is the lowest dealing with construction permits: time recorded in China?
The lowest recorded value was 110.88 days in 2019.
How does China rank for dealing with construction permits: time?
China ranks 127th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in China?
Over the last ten years it is down 71.6%. The long-run trend across the full record is falling.
Where does this China data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in China. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/china/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/china/">Dealing with construction permits: Time in China</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.