China vs Uganda: Dealing with construction permits: Time

China
110.88 days
in 2019
Uganda
113 days
in 2019
China rank
124th
Uganda rank
121st

Dealing with construction permits: Time over time

  • China
  • Uganda
100200300400200520122019

How they compare

Uganda currently reports 113 days against 110.88 days in China, a difference of 2.12 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was China ahead.

China ranks 124th and Uganda ranks 121st of 185 countries.

China has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade China Uganda Difference Ahead
2000s 392.8 days 145 days 247.8 days China
2010s 267.39 days 130.7 days 136.69 days China

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, China or Uganda?
Uganda, at 113 days against 110.88 days in China as of 2019.
What is the difference in dealing with construction permits: time between China and Uganda?
2.12 days, with Uganda ahead.
How many years of comparable data are there for China and Uganda?
15 years are reported by both, from 2005 to 2019.
How do China and Uganda rank globally for dealing with construction permits: time?
China ranks 124th and Uganda ranks 121st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.