Dealing with construction permits: Time (days) (Time days) in Uganda

Uganda: Dealing with construction permits: Time was 113 days in 2019. ▼ Falling

Latest (2019)
113 days
Change on year
unchanged
World rank
124th
of 188 countries
All-time high
149 days
in 2013
All-time low
113 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Uganda, 2005–2019

0501001502005201220192005: 145 days2006: 145 days2007: 145 days2008: 145 days2009: 145 days2010: 146 days2011: 146 days2012: 146 days2013: 149 days2014: 128 days2015: 122 days2016: 122 days2017: 122 days2018: 113 days2019: 113 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Uganda is 113 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 22.1% over ten years.

Over the whole period, dealing with construction permits: time in Uganda peaked at 149 days in 2013 and was at its lowest, 113 days, in 2018.

Uganda ranks 124th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Uganda, year by year

Annual values for Dealing with construction permits: Time (days) in Uganda, 2005 to 2019.
Year days Change
2005 145 days —
2006 145 days +0.0%
2007 145 days +0.0%
2008 145 days +0.0%
2009 145 days +0.0%
2010 146 days +0.7%
2011 146 days +0.0%
2012 146 days +0.0%
2013 149 days +2.1%
2014 128 days -14.1%
2015 122 days -4.7%
2016 122 days +0.0%
2017 122 days +0.0%
2018 113 days -7.4%
2019 113 days +0.0%

Uganda compared with similar countries

  • Uganda's 113 days is below the median for low income countries, which is 133.5 days, 85% of the median. (22 countries reporting)
  • Uganda's 113 days is below the median for Sub-Saharan Africa, which is 143.5 days, 79% of the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 145 days 145 days 145 days 5
2010s 130.7 days 113 days 149 days 10

Countries ranked near Uganda

  1. 121 Azerbaijan 116 days compare
  2. 121 Eswatini 116 days compare
  3. 121 Saint Lucia 116 days compare
  4. 124 Seychelles 113 days compare
  5. 124 Thailand 113 days compare
  6. 127 China 110.88 days compare

See the full ranking of 188 places →

More private sector data for Uganda

All data for Uganda →

Frequently asked questions

What is dealing with construction permits: time in Uganda?
Dealing with construction permits: time in Uganda was 113 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Uganda?
The highest recorded value was 149 days in 2013.
What is the lowest dealing with construction permits: time recorded in Uganda?
The lowest recorded value was 113 days in 2018.
How does Uganda rank for dealing with construction permits: time?
Uganda ranks 124th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Uganda?
Over the last ten years it is down 22.1%. The long-run trend across the full record is falling.
Where does this Uganda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Uganda. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/uganda/">Dealing with construction permits: Time in Uganda</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.