Dealing with construction permits: Time in Uganda

Uganda: Dealing with construction permits: Time was 113 days in 2019. ▼ Falling

Latest (2019)
113 days
Change on year
unchanged
World rank
121st
of 185 countries
All-time high
149 days
in 2013
All-time low
113 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Uganda, 2005–2019

0501001502005201220192005: 145 days2006: 145 days2007: 145 days2008: 145 days2009: 145 days2010: 146 days2011: 146 days2012: 146 days2013: 149 days2014: 128 days2015: 122 days2016: 122 days2017: 122 days2018: 113 days2019: 113 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Uganda is 113 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 22.1% over ten years.

Over the whole period, dealing with construction permits: time in Uganda peaked at 149 days in 2013 and was at its lowest, 113 days, in 2018.

Uganda ranks 121st of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 145 days 145 days 145 days 5
2010s 130.7 days 113 days 149 days 10

Countries ranked near Uganda

  1. 118 Azerbaijan 116 days compare
  2. 118 Eswatini 116 days compare
  3. 118 St. Lucia 116 days compare
  4. 121 Seychelles 113 days compare
  5. 121 Thailand 113 days compare
  6. 124 China 110.88 days compare

See the full ranking of 187 places →

More private sector data for Uganda

All data for Uganda →

Frequently asked questions

What is dealing with construction permits: time in Uganda?
Dealing with construction permits: time in Uganda was 113 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Uganda?
The highest recorded value was 149 days in 2013.
What is the lowest dealing with construction permits: time recorded in Uganda?
The lowest recorded value was 113 days in 2018.
How does Uganda rank for dealing with construction permits: time?
Uganda ranks 121st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Uganda?
Over the last ten years it is down 22.1%. The long-run trend across the full record is falling.
Where does this Uganda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.