Colombia vs Honduras: Dealing with construction permits: Time

Colombia
132 days
in 2019
Honduras
132 days
in 2019
Colombia rank
98th
Honduras rank
98th

Dealing with construction permits: Time over time

  • Colombia
  • Honduras
050100150200200520122019

How they compare

Colombia currently reports 132 days against 132 days in Honduras, a difference of 0 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Honduras ahead.

Colombia ranks 98th and Honduras ranks 98th of 185 countries.

Across the 2 decades both report, Colombia averaged higher in 1 and Honduras in 1.

Head to head by decade

Decade Colombia Honduras Difference Ahead
2000s 149.2 days 150.8 days 1.6 days Honduras
2010s 132 days 123.6 days 8.4 days Colombia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Colombia or Honduras?
Colombia, at 132 days against 132 days in Honduras as of 2019.
What is the difference in dealing with construction permits: time between Colombia and Honduras?
0 days, with Colombia ahead.
How many years of comparable data are there for Colombia and Honduras?
15 years are reported by both, from 2005 to 2019.
How do Colombia and Honduras rank globally for dealing with construction permits: time?
Colombia ranks 98th and Honduras ranks 98th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.