Dealing with construction permits: Time (days) (Time days) in Honduras
Honduras: Dealing with construction permits: Time was 132 days in 2019. ▼ Falling
Dealing with construction permits: Time in Honduras, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Honduras stood at 132 days.
That represents a change of up 17.9% over ten years.
Over the whole period, dealing with construction permits: time in Honduras peaked at 190 days in 2005 and was at its lowest, 112 days, in 2009.
Honduras ranks 101st of 188 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Dealing with construction permits: Time in Honduras, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 190 days | — |
| 2006 | 190 days | +0.0% |
| 2007 | 131 days | -31.1% |
| 2008 | 131 days | +0.0% |
| 2009 | 112 days | -14.5% |
| 2010 | 116 days | +3.6% |
| 2011 | 116 days | +0.0% |
| 2012 | 116 days | +0.0% |
| 2013 | 131 days | +12.9% |
| 2014 | 117 days | -10.7% |
| 2015 | 118 days | +0.9% |
| 2016 | 118 days | +0.0% |
| 2017 | 140 days | +18.6% |
| 2018 | 132 days | -5.7% |
| 2019 | 132 days | +0.0% |
Honduras compared with similar countries
- Honduras's 132 days is below the median for lower middle income countries, which is 159 days, 83% of the median. (47 countries reporting)
- Honduras's 132 days is below the median for Latin America & Caribbean, which is 165 days, 80% of the median. (33 countries reporting)
Biggest year-on-year movements
Years where Dealing with construction permits: Time in Honduras changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.
| Year | Change | From | To |
|---|---|---|---|
| 2007 | -31.1% | 190 days | 131 days |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 150.8 days | 112 days | 190 days | 5 |
| 2010s | 123.6 days | 116 days | 140 days | 10 |
Countries ranked near Honduras
More private sector data for Honduras
- Merchandise trade 77.4% (2025)
- Food imports 19.5% (2024)
- Manufactures imports 61.5% (2024)
- Merchandise imports 18.64 billion current US$ (2025)
- Food exports 53.5% (2024)
- Manufactures exports 39.1% (2024)
- Merchandise exports 12.00 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,091 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.3031 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 8.31 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: time in Honduras?
- Dealing with construction permits: time in Honduras was 132 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Honduras?
- The highest recorded value was 190 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Honduras?
- The lowest recorded value was 112 days in 2009.
- How does Honduras rank for dealing with construction permits: time?
- Honduras ranks 101st out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Honduras?
- Over the last ten years it is up 17.9%. The long-run trend across the full record is falling.
- Where does this Honduras data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.