Dealing with construction permits: Time (days) (Time days) in Honduras

Honduras: Dealing with construction permits: Time was 132 days in 2019. ▼ Falling

Latest (2019)
132 days
Change on year
unchanged
World rank
101st
of 188 countries
All-time high
190 days
in 2005
All-time low
112 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Honduras, 2005–2019

0501001502002005201220192005: 190 days2006: 190 days2007: 131 days2008: 131 days2009: 112 days2010: 116 days2011: 116 days2012: 116 days2013: 131 days2014: 117 days2015: 118 days2016: 118 days2017: 140 days2018: 132 days2019: 132 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Honduras stood at 132 days.

That represents a change of up 17.9% over ten years.

Over the whole period, dealing with construction permits: time in Honduras peaked at 190 days in 2005 and was at its lowest, 112 days, in 2009.

Honduras ranks 101st of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Honduras, year by year

Annual values for Dealing with construction permits: Time (days) in Honduras, 2005 to 2019.
Year days Change
2005 190 days —
2006 190 days +0.0%
2007 131 days -31.1%
2008 131 days +0.0%
2009 112 days -14.5%
2010 116 days +3.6%
2011 116 days +0.0%
2012 116 days +0.0%
2013 131 days +12.9%
2014 117 days -10.7%
2015 118 days +0.9%
2016 118 days +0.0%
2017 140 days +18.6%
2018 132 days -5.7%
2019 132 days +0.0%

Honduras compared with similar countries

  • Honduras's 132 days is below the median for lower middle income countries, which is 159 days, 83% of the median. (47 countries reporting)
  • Honduras's 132 days is below the median for Latin America & Caribbean, which is 165 days, 80% of the median. (33 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Honduras changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2007 -31.1% 190 days 131 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 150.8 days 112 days 190 days 5
2010s 123.6 days 116 days 140 days 10

Countries ranked near Honduras

  1. 99 Ethiopia 136 days compare
  2. 100 Tunisia 133 days compare
  3. 101 Colombia 132 days compare
  4. 101 Ecuador 132 days compare
  5. 104 Algeria 131 days compare
  6. 104 South Sudan 131 days compare

See the full ranking of 188 places →

More private sector data for Honduras

All data for Honduras →

Frequently asked questions

What is dealing with construction permits: time in Honduras?
Dealing with construction permits: time in Honduras was 132 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Honduras?
The highest recorded value was 190 days in 2005.
What is the lowest dealing with construction permits: time recorded in Honduras?
The lowest recorded value was 112 days in 2009.
How does Honduras rank for dealing with construction permits: time?
Honduras ranks 101st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Honduras?
Over the last ten years it is up 17.9%. The long-run trend across the full record is falling.
Where does this Honduras data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Honduras. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/honduras/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/honduras/">Dealing with construction permits: Time in Honduras</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.