Dealing with construction permits: Time (days) (Time days) in Colombia

Colombia: Dealing with construction permits: Time was 132 days in 2019. ▼ Falling

Latest (2019)
132 days
Change on year
unchanged
World rank
101st
of 188 countries
All-time high
167 days
in 2006
All-time low
114 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Colombia, 2005–2019

0501001502005201220192005: 162 days2006: 167 days2007: 167 days2008: 136 days2009: 114 days2010: 132 days2011: 132 days2012: 132 days2013: 132 days2014: 132 days2015: 132 days2016: 132 days2017: 132 days2018: 132 days2019: 132 days

Source: World Bank. Measured in days.

Analysis

Colombia recorded 132 days for dealing with construction permits: time in 2019.

That represents a change of up 15.8% over ten years.

Over the whole period, dealing with construction permits: time in Colombia peaked at 167 days in 2006 and was at its lowest, 114 days, in 2009.

That places Colombia 101st out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Colombia, year by year

Annual values for Dealing with construction permits: Time (days) in Colombia, 2005 to 2019.
Year days Change
2005 162 days —
2006 167 days +3.1%
2007 167 days +0.0%
2008 136 days -18.6%
2009 114 days -16.2%
2010 132 days +15.8%
2011 132 days +0.0%
2012 132 days +0.0%
2013 132 days +0.0%
2014 132 days +0.0%
2015 132 days +0.0%
2016 132 days +0.0%
2017 132 days +0.0%
2018 132 days +0.0%
2019 132 days +0.0%

Colombia compared with similar countries

  • Colombia's 132 days is above the median for upper middle income countries, which is 131 days, 1.0× the median. (55 countries reporting)
  • Colombia's 132 days is below the median for Latin America & Caribbean, which is 165 days, 80% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 149.2 days 114 days 167 days 5
2010s 132 days 132 days 132 days 10

Countries ranked near Colombia

  1. 99 Ethiopia 136 days compare
  2. 100 Tunisia 133 days compare
  3. 101 Ecuador 132 days compare
  4. 101 Honduras 132 days compare
  5. 104 Algeria 131 days compare
  6. 104 South Sudan 131 days compare

See the full ranking of 188 places →

More private sector data for Colombia

All data for Colombia →

Frequently asked questions

What is dealing with construction permits: time in Colombia?
Dealing with construction permits: time in Colombia was 132 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Colombia?
The highest recorded value was 167 days in 2006.
What is the lowest dealing with construction permits: time recorded in Colombia?
The lowest recorded value was 114 days in 2009.
How does Colombia rank for dealing with construction permits: time?
Colombia ranks 101st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Colombia?
Over the last ten years it is up 15.8%. The long-run trend across the full record is falling.
Where does this Colombia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Colombia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/colombia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/colombia/">Dealing with construction permits: Time in Colombia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.