Comoros vs India: Dealing with construction permits: Time (days) (Time days)

Comoros
107 days
in 2019
India
106.22 days
in 2019
Comoros rank
131st
India rank
132nd

Dealing with construction permits: Time (days) (Time days) over time

  • Comoros
  • India
050100150200200520122019

How they compare

Comoros currently reports 107 days against 106.22 days in India, a difference of 0.78 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was India ahead.

Comoros ranks 131st and India ranks 132nd of 188 countries.

India has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Comoros India Difference Ahead
2000s 107 days 202 days 95 days India
2010s 107 days 166.8 days 59.8 days India

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Comoros or India?
Comoros, at 107 days against 106.22 days in India as of 2019.
What is the difference in dealing with construction permits: time between Comoros and India?
0.78 days, with Comoros ahead.
How many years of comparable data are there for Comoros and India?
15 years are reported by both, from 2005 to 2019.
How do Comoros and India rank globally for dealing with construction permits: time?
Comoros ranks 131st and India ranks 132nd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros vs India: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/comoros/india/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/comoros/india/">Comoros vs India: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.