Dealing with construction permits: Time in Comoros

Comoros: Dealing with construction permits: Time was 107 days in 2019. ▬ Flat

Latest (2019)
107 days
Change on year
unchanged
World rank
128th
of 185 countries
All-time high
107 days
in 2005
All-time low
107 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Comoros, 2005–2019

02550751002005201220192005: 107 days2006: 107 days2007: 107 days2008: 107 days2009: 107 days2010: 107 days2011: 107 days2012: 107 days2013: 107 days2014: 107 days2015: 107 days2016: 107 days2017: 107 days2018: 107 days2019: 107 days

Source: World Bank. Measured in days.

Analysis

Comoros recorded 107 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Comoros peaked at 107 days in 2005 and was at its lowest, 107 days, in 2005.

That places Comoros 128th out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 107 days 107 days 107 days 5
2010s 107 days 107 days 107 days 10

Countries ranked near Comoros

  1. 125 Norway 109.5 days compare
  2. 126 Japan 108.35 days compare
  3. 127 Palestine 108 days compare
  4. 129 India 106.22 days compare
  5. 130 Panama 105 days compare
  6. 130 Saint Kitts and Nevis 105 days compare

See the full ranking of 187 places →

More private sector data for Comoros

All data for Comoros →

Frequently asked questions

What is dealing with construction permits: time in Comoros?
Dealing with construction permits: time in Comoros was 107 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Comoros?
The highest recorded value was 107 days in 2005.
What is the lowest dealing with construction permits: time recorded in Comoros?
The lowest recorded value was 107 days in 2005.
How does Comoros rank for dealing with construction permits: time?
Comoros ranks 128th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Comoros?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Comoros data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.