Dealing with construction permits: Time in Comoros
Comoros: Dealing with construction permits: Time was 107 days in 2019. ▬ Flat
Dealing with construction permits: Time in Comoros, 2005–2019
Source: World Bank. Measured in days.
Analysis
Comoros recorded 107 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Comoros peaked at 107 days in 2005 and was at its lowest, 107 days, in 2005.
That places Comoros 128th out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 107 days | 107 days | 107 days | 5 |
| 2010s | 107 days | 107 days | 107 days | 10 |
Countries ranked near Comoros
More private sector data for Comoros
- Merchandise trade 23.1% (2025)
- Food imports 42.1% (2023)
- Manufactures imports 46.5% (2023)
- Merchandise imports 371.00 million current US$ (2025)
- Food exports 88.5% (2023)
- Manufactures exports 10.2% (2023)
- Merchandise exports 48.00 million current US$ (2025)
- Commercial service exports 110.18 million current US$ (2023)
- Transport services 40.9% (2023)
- Computer, communications and other services 12.7% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Comoros?
- Dealing with construction permits: time in Comoros was 107 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Comoros?
- The highest recorded value was 107 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Comoros?
- The lowest recorded value was 107 days in 2005.
- How does Comoros rank for dealing with construction permits: time?
- Comoros ranks 128th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Comoros?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Comoros data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.